X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204201311000

Well Details

Well ID: 0204201311000
Loading map...
Location: 00/11-13-020-20W4/0
Location Alias: 00/11-13-20-20 W4M
Location Alias 2: 00/11-13-020-20 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 20
Section: 13
County/Municipality: Vulcan County
Well Name: VH1 JBUSH 11-13-20-20
Operator Name: Razor Energy Corp.
License Number: 0148380
License Date: 1991-03-13
License Status: Suspension
Spud Date: 1991-03-13
Final Drill Date: 1991-03-17
Well Total Depth: 1423.00 m
Surface Hole Latitude: 50.697499
Surface Hole Longitude: -112.650686

For data sources see[1][2]

Well History

Date Event
1991-03-13 Obtained License
1991-03-14 Surface Casing Operation Performed
1991-03-17 Finished Drilling
1991-03-17 Well Log Performed
1991-03-17 Well Mode changed to Drilled and Cased
1991-03-18 Production Casing Operation Performed
1991-03-19 Rig Released
1991-03-21 Well Log Performed
1991-03-22 Perforation Treatment Performed - Jet Perforation
1991-03-23 Perforation Treatment Performed - Acid Wash - No Pressure
1991-03-24 Perforation Treatment Performed - Jet Perforation
1991-03-28 Well Began Production
1991-03-28 Well Fluid changed to Crude Oil
1991-03-28 Well Mode changed to Flowing
1991-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-15 Perforation Treatment Performed - Cement Squeeze
1994-06-16 Well Fluid changed to Crude Oil
1994-06-16 Well Mode changed to Pumping
1995-08-02 Well Log Performed
1996-07-14 Well Log Performed
2002-01-09 Perforation Treatment Performed - Jet Perforation
2004-02-20 Perforation Treatment Performed - Jet Perforation
2004-02-20 Well Log Performed
2014-01-31 Well Fluid changed to Crude Oil
2014-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-22 Perforation 425.00 425.50 13
1991-03-23 Acid Wash 425.00 425.50 0
1991-03-24 Perforation 1382.00 1385.00 13
1991-04-14 Acid Treatment 425.00 425.50 0
1991-04-15 Cement Squeeze 425.00 425.50 0
2002-01-09 Perforation 1379.00 1382.00 20
2004-02-20 Perforation 1374.50 1375.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5707 0.0 0.0 0.0
1992 8191 0.0 0.0 0.0
1993 8501 0.0 0.0 0.0
1994 8117 0.0 0.0 0.0
1995 8492 0.0 0.0 0.0
1996 8669 0.0 0.0 0.0
1997 8626 0.0 0.0 0.0
1998 7796 0.0 0.0 0.0
1999 8463 0.0 0.0 0.0
2000 8662 0.0 0.0 0.0
2001 7301 0.0 0.0 0.0
2002 8141 0.0 0.0 0.0
2003 8517 0.0 0.0 0.0
2004 8223 0.0 0.0 0.0
2005 8694 0.0 0.0 0.0
2006 8641 0.0 0.0 0.0
2007 8677 0.0 0.0 0.0
2008 7755 0.0 0.0 0.0

For data sources see[5]

References