If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204201416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.701138,"lon":-112.66249,"icon":""}]} |
Location: 02/16-14-020-20W4/0 | |
Location Alias: 02/16-14-20-20 W4M | |
Location Alias 2: 02/16-14-020-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 20 | |
Section: 14 | |
County/Municipality: Vulcan County | |
Well Name: VH1 JBUSH 16-14-20-20 | |
Operator Name: Razor Energy Corp. | |
License Number: 0152934 | |
License Date: 1992-06-29 | |
License Status: Suspension | |
Spud Date: 1992-07-21 | |
Final Drill Date: 1992-07-24 | |
Well Total Depth: 1421.00 m | |
Surface Hole Latitude: 50.701138 | |
Surface Hole Longitude: -112.662490 |
Date | Event |
---|---|
1992-06-29 | Obtained License |
1992-07-22 | Surface Casing Operation Performed |
1992-07-23 | Well Log Performed |
1992-07-24 | Finished Drilling |
1992-07-24 | Well Log Performed |
1992-07-24 | Well Mode changed to Drilled and Cased |
1992-07-25 | Production Casing Operation Performed |
1992-07-25 | Rig Released |
1992-07-30 | Well Log Performed |
1992-07-31 | Well Log Performed |
1992-08-01 | Perforation Treatment Performed - Jet Perforation |
1992-08-09 | Well Began Production |
1992-08-09 | Well Fluid changed to Crude Oil |
1992-08-09 | Well Mode changed to Flowing |
1993-11-19 | Well Fluid changed to Crude Oil |
1993-11-19 | Well Mode changed to Pumping |
1993-11-20 | Perforation Treatment Performed - Fractured |
1993-11-20 | Perforation Treatment Performed - Jet Perforation |
1993-11-20 | Well Log Performed |
2002-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-27 | Perforation Treatment Performed - Jet Perforation |
2002-07-27 | Plug Back Performed |
2002-07-27 | Well Fluid changed to Crude Oil |
2002-07-27 | Well Log Performed |
2002-07-27 | Well Mode changed to Abandoned Zone |
2002-07-29 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-08-01 | Perforation | 1378.00 | 1379.00 | 17 |
1992-08-01 | Perforation | 1380.00 | 1381.50 | 17 |
1993-11-20 | Perforation | 1378.00 | 1379.00 | 17 |
1993-11-20 | Perforation | 1380.00 | 1381.50 | 17 |
1993-11-20 | Fracture | 1378.00 | 1381.50 | 0 |
2002-07-27 | Packing Device Capped w/Cement | 1367.00 | 1375.00 | 0 |
2002-07-27 | Perforation | 1212.50 | 1218.50 | 20 |
2002-07-27 | Perforation | 1210.00 | 1211.00 | 20 |
2002-07-29 | Fracture | 1210.00 | 1218.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 3437 | 0.0 | 0.0 | 0.0 |
1993 | 8409 | 0.0 | 0.0 | 0.0 |
1994 | 8408 | 0.0 | 0.0 | 0.0 |
1995 | 8597 | 0.0 | 0.0 | 0.0 |
1996 | 8731 | 0.0 | 0.0 | 0.0 |
1997 | 8738 | 0.0 | 0.0 | 0.0 |
1998 | 8647 | 0.0 | 0.0 | 0.0 |
1999 | 8735 | 0.0 | 0.0 | 0.0 |
2000 | 8651 | 0.0 | 0.0 | 0.0 |
2001 | 2808 | 0.0 | 0.0 | 0.0 |
For data sources see[5]