X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204241608000

Well Details

Well ID: 0204241608000
Loading map...
Location: 00/08-16-020-24W4/0
Location Alias: 00/08-16-20-24 W4M
Location Alias 2: 00/08-16-020-24 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 24
Section: 16
County/Municipality: Vulcan County
Well Name: CYPRESS FARROW 8-16-20-24
Operator Name: TAQA North Ltd.
License Number: 0126917
License Date: 1987-06-18
License Status: Abandoned
Spud Date: 1987-06-19
Final Drill Date: 1987-06-29
Well Total Depth: 1780.00 m
Surface Hole Latitude: 50.692910
Surface Hole Longitude: -113.264335

For data sources see[1][2]

Well History

Date Event
1987-06-18 Obtained License
1987-06-21 Surface Casing Operation Performed
1987-06-29 Finished Drilling
1987-06-29 Well Mode changed to Drilled and Cased
1987-06-30 Drill Stem Test Performed
1987-06-30 Well Log Performed
1987-07-01 Drill Stem Test Performed
1987-07-03 Production Casing Operation Performed
1987-07-03 Rig Released
1987-07-10 Perforation Treatment Performed - Jet Perforation
1987-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-12 Perforation Treatment Performed - Jet Perforation
1987-07-12 Plug Back Performed
1987-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-13 Perforation Treatment Performed - Jet Perforation
1987-07-13 Plug Back Performed
1987-07-14 Well Began Production
1987-07-14 Well Fluid changed to Crude Oil
1987-07-14 Well Mode changed to Flowing
1987-10-02 Well Fluid changed to Crude Oil
1987-10-02 Well Mode changed to Pumping
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1999-12-23 Perforation Treatment Performed - Jet Perforation
2009-02-19 Perforation Treatment Performed - Jet Perforation
2009-02-19 Well Log Performed
2009-02-21 Perforation Treatment Performed - Cement Squeeze
2009-02-21 Perforation Treatment Performed - Remedial Casing
2009-02-22 Perforation Treatment Performed - Cement Plug
2009-02-22 Perforation Treatment Performed - Jet Perforation
2009-02-22 Plug Back Performed
2009-02-22 Well Fluid changed to Crude Oil
2009-02-22 Well Log Performed
2009-02-22 Well Mode changed to Abandoned Zone
2009-02-23 Perforation Treatment Performed - Remedial Casing
2009-02-24 Perforation Treatment Performed - Cement Plug
2009-02-24 Plug Back Performed
2009-02-27 Well Log Performed
2009-03-24 Well Abandoned
2009-03-24 Well Fluid changed to Crude Oil
2009-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-10 Perforation 1768.00 1771.00 13
2009-02-19 Perforation 907.80 908.80 13
2009-02-21 Remedial Casing Cementing 1034.60 1035.60 0
2009-02-21 Remedial Casing Cementing 990.00 991.00 0
2009-02-21 Remedial Casing Cementing 907.80 908.80 0
2009-02-21 Cement Squeeze 618.00 621.50 0
2009-02-22 Cement Plug 595.00 1051.00 0
2009-02-22 Perforation 545.00 546.00 13
2009-02-22 Perforation 495.00 496.00 13
2009-02-22 Perforation 414.00 415.00 13
2009-02-22 Perforation 380.00 381.00 13
1987-07-11 Acid Treatment 1768.00 1771.00 0
2009-02-22 Perforation 373.00 374.00 13
2009-02-22 Perforation 339.00 340.00 13
2009-02-22 Perforation 299.00 300.00 13
2009-02-23 Remedial Casing Cementing 545.00 546.00 0
2009-02-23 Remedial Casing Cementing 495.00 496.00 0
2009-02-23 Remedial Casing Cementing 414.00 415.00 0
2009-02-23 Remedial Casing Cementing 380.00 381.00 0
2009-02-23 Remedial Casing Cementing 373.00 374.00 0
2009-02-23 Remedial Casing Cementing 339.00 340.00 0
2009-02-23 Remedial Casing Cementing 299.00 300.00 0
1987-07-12 Packing Device Capped w/Cement 1754.00 1762.00 0
2009-02-24 Cement Plug 241.00 562.00 0
1987-07-12 Perforation 1688.00 1693.00 13
1987-07-13 Packing Device Capped w/Cement 1672.00 1680.00 0
1987-07-13 Perforation 1435.50 1437.00 13
1999-12-23 Perforation 618.00 621.50 17
2009-02-19 Perforation 1034.60 1035.60 13
2009-02-19 Perforation 990.00 991.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2237 0.0 0.0 0.0
1988 3665 0.0 0.0 0.0

For data sources see[5]

References