If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224091210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.857867,"lon":-111.121304,"icon":""}]} |
Location: 00/10-12-022-09W4/0 | |
Location Alias: 00/10-12-22-09 W4M | |
Location Alias 2: 00/10-12-022-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 09 | |
Section: 12 | |
County/Municipality: Special Areas No. 2 | |
Well Name: FINA JENNER 10-12-22-9 | |
Operator Name: General Energy Recovery Inc. | |
License Number: 0008121 | |
License Date: 1954-06-15 | |
License Status: RecExempt | |
Spud Date: 1954-06-27 | |
Final Drill Date: 1954-07-13 | |
Well Total Depth: 1023.80 m | |
Surface Hole Latitude: 50.857867 | |
Surface Hole Longitude: -111.121304 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-06-15 | Obtained License |
1954-07-01 | Perforation Treatment Performed - Bullet Perforation |
1954-07-01 | Production Casing Operation Performed |
1954-07-13 | Drill Stem Test Performed |
1954-07-13 | Finished Drilling |
1954-07-13 | Well Log Performed |
1954-07-13 | Well Mode changed to Drilled and Cased |
1954-07-27 | Well Began Production |
1954-07-27 | Well Fluid changed to Crude Oil |
1954-07-27 | Well Mode changed to Flowing |
1954-09-22 | Well Fluid changed to Crude Oil |
1954-09-22 | Well Mode changed to Suspended |
1977-10-20 | Perforation Treatment Performed - Cement Squeeze |
1977-10-25 | Perforation Treatment Performed - Jet Perforation |
1978-06-21 | Well Fluid changed to Crude Oil |
1978-06-21 | Well Mode changed to Flowing |
1978-09-20 | Perforation Treatment Performed - Cement Squeeze |
1978-10-03 | Perforation Treatment Performed - Jet Perforation |
1978-10-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-10-06 | Perforation Treatment Performed - Jet Perforation |
1978-10-07 | Perforation Treatment Performed - Cement Squeeze |
1979-10-26 | Well Fluid changed to Crude Oil |
1979-10-26 | Well Mode changed to Suspended |
1991-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-02-25 | Perforation Treatment Performed - Jet Perforation |
1991-02-25 | Plug Back Performed |
1991-02-25 | Well Fluid changed to Crude Oil |
1991-02-25 | Well Mode changed to Abandoned |
1991-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-02-26 | Plug Back Performed |
1991-02-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-07-01 | Bullet Perforation | 961.90 | 962.90 | 13 |
1991-02-25 | Packing Device Capped w/Cement | 939.00 | 947.00 | 0 |
1991-02-25 | Perforation | 690.00 | 691.00 | 13 |
1991-02-25 | Perforation | 300.00 | 301.00 | 13 |
1991-02-26 | Packing Device Capped w/Cement | 282.00 | 290.00 | 0 |
1977-10-20 | Cement Squeeze | 961.90 | 962.90 | 0 |
1977-10-25 | Perforation | 960.70 | 961.90 | 13 |
1977-10-25 | Perforation | 955.50 | 960.10 | 7 |
1978-09-20 | Cement Squeeze | 955.50 | 961.90 | 0 |
1978-10-03 | Perforation | 957.10 | 960.70 | 10 |
1978-10-04 | Acid Wash | 957.10 | 960.70 | 0 |
1978-10-06 | Perforation | 798.00 | 799.80 | 10 |
1978-10-07 | Cement Squeeze | 798.00 | 799.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 744 | 0.0 | 0.0 | 0.0 |
1978 | 1407 | 0.0 | 0.0 | 0.0 |
1979 | 1368 | 0.0 | 0.0 | 0.0 |
For data sources see[5]