If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224263012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.903255,"lon":-113.607262,"icon":""}]} |
Location: 00/12-30-022-26W4/0 | |
Location Alias: 00/12-30-22-26 W4M | |
Location Alias 2: 00/12-30-022-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 26 | |
Section: 30 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 12-30-22-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0394086 | |
License Date: 2008-02-13 | |
License Status: Amended | |
Spud Date: 2008-09-27 | |
Final Drill Date: 2008-09-28 | |
Well Total Depth: 1102.00 m | |
Surface Hole Latitude: 50.903255 | |
Surface Hole Longitude: -113.607262 |
Date | Event |
---|---|
2008-02-13 | Obtained License |
2008-09-27 | Direction Drilling Operation Performed - Deviate |
2008-09-27 | Surface Casing Operation Performed |
2008-09-28 | Finished Drilling |
2008-09-28 | Production Casing Operation Performed |
2008-09-28 | Well Mode changed to Drilled and Cased |
2008-09-29 | Rig Released |
2008-11-03 | Perforation Treatment Performed - Jet Perforation |
2008-11-15 | Perforation Treatment Performed - Fractured |
2008-11-20 | Well Fluid changed to Gas |
2008-11-20 | Well Mode changed to Testing |
2009-01-06 | Well Began Production |
2009-01-06 | Well Fluid changed to Gas |
2009-01-06 | Well Mode changed to Flowing |
2010-08-28 | Perforation Treatment Performed - Jet Perforation |
2010-09-02 | Perforation Treatment Performed - Fractured |
2010-09-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-10 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-09-27 | 4.20 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-11-03 | Perforation | 950.00 | 953.00 | 13 |
2010-08-28 | Perforation | 388.00 | 389.00 | 13 |
2010-08-28 | Perforation | 385.30 | 386.30 | 13 |
2010-08-28 | Perforation | 541.10 | 543.10 | 13 |
2010-08-28 | Perforation | 465.30 | 465.80 | 13 |
2010-08-28 | Perforation | 409.50 | 410.00 | 13 |
2010-08-28 | Perforation | 585.00 | 586.00 | 13 |
2010-08-28 | Perforation | 260.00 | 263.00 | 13 |
2010-08-28 | Perforation | 682.00 | 684.00 | 13 |
2010-08-28 | Perforation | 278.00 | 281.00 | 13 |
2010-08-28 | Perforation | 813.00 | 816.00 | 13 |
2008-11-15 | Fracture | 950.00 | 953.00 | 0 |
2010-08-28 | Perforation | 697.00 | 700.00 | 13 |
2010-08-28 | Perforation | 679.00 | 680.00 | 13 |
2010-08-28 | Perforation | 623.50 | 624.50 | 13 |
2010-08-28 | Perforation | 601.00 | 603.00 | 13 |
2010-08-28 | Perforation | 596.00 | 598.00 | 13 |
2010-08-28 | Perforation | 667.00 | 668.00 | 13 |
2010-08-28 | Perforation | 649.50 | 651.50 | 13 |
2010-09-02 | Fracture | 385.30 | 684.00 | 0 |
2010-09-02 | Fracture | 260.00 | 816.00 | 0 |
2010-08-28 | Perforation | 568.00 | 568.50 | 13 |
2010-08-28 | Perforation | 555.00 | 556.00 | 13 |
2010-08-28 | Perforation | 548.00 | 551.00 | 13 |
2010-08-28 | Perforation | 583.70 | 584.70 | 13 |
2010-08-28 | Perforation | 582.50 | 583.50 | 13 |
2010-08-28 | Perforation | 572.00 | 573.00 | 13 |
2010-08-28 | Perforation | 392.50 | 393.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 48 | 0.0 | 0.0 | 0.0 |
2009 | 8621 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 5541 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8722 | 0.0 | 0.0 | 0.0 |
2015 | 8745 | 0.0 | 0.0 | 0.0 |
2016 | 8718 | 0.0 | 0.0 | 0.0 |
2017 | 8733 | 0.0 | 0.0 | 0.0 |
2018 | 8693 | 0.0 | 0.0 | 0.0 |
2019 | 8716 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]