X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264113403002

Well Details

Well ID: 0264113403002
Loading map...
Location: 00/03-34-026-11W4/2
Location Alias: 00/03-34-26-11 W4M
Location Alias 2: 00/03-34-026-11 W4/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 11
Section: 34
County/Municipality: Special Areas No. 2
Well Name: NUVISTA SUNNYN 3-34-26-11
Operator Name: NuVista Energy Ltd.
License Number: 0147107
License Date: 1990-12-21
License Status: Abandoned
Spud Date: 1991-02-18
Final Drill Date: 1991-02-21
Well Total Depth: 1115.00 m
Surface Hole Latitude: 51.259665
Surface Hole Longitude: -111.459839

For data sources see[1][2]

Well History

Date Event
1990-12-21 Obtained License
1991-02-19 Surface Casing Operation Performed
1991-02-21 Finished Drilling
1991-02-21 Well Mode changed to Drilled and Cased
1991-02-22 Well Log Performed
1991-02-23 Drill Stem Test Performed
1991-02-24 Production Casing Operation Performed
1991-02-24 Rig Released
1991-03-13 Well Log Performed
1991-03-14 Perforation Treatment Performed - Jet Perforation
1991-03-14 Well Log Performed
1991-04-01 Perforation Treatment Performed - Jet Perforation
1991-04-02 Well Log Performed
1993-12-07 Well Began Production
1993-12-07 Well Fluid changed to Gas
1993-12-07 Well Mode changed to Flowing
1994-01-05 Well Fluid changed to Gas
1994-01-05 Well Mode changed to Suspended
2006-04-25 Perforation Treatment Performed - Jet Perforation
2006-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-01 Plug Back Performed
2006-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-11 Plug Back Performed
2006-08-11 Well Fluid changed to Gas
2006-08-11 Well Log Performed
2006-08-11 Well Mode changed to Abandoned Zone
2006-08-13 Well Log Performed
2006-09-05 Perforation Treatment Performed - Jet Perforation
2006-09-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2006-09-08 Perforation Treatment Performed - Remedial Casing
2006-09-11 Well Abandoned
2006-09-11 Well Fluid changed to Gas
2006-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-14 Perforation 960.50 964.00 13
2006-09-08 Remedial Casing Cementing 261.80 280.00 0
1991-04-01 Perforation 874.00 875.50 14
1991-04-01 Perforation 876.30 877.60 14
2006-04-25 Perforation 1053.00 1053.40 20
2006-05-01 Packing Device Capped w/Cement 950.00 958.00 0
2006-05-01 Packing Device Capped w/Cement 1042.00 1050.00 0
2006-08-11 Packing Device Capped w/Cement 862.00 870.00 0
2006-09-05 Perforation 262.00 263.00 14
2006-09-07 Hydra Jet Perforation 261.80 280.00 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 243 0.0 0.0 0.0
1994 113 0.0 0.0 0.0

For data sources see[5]

References