X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275022316000

Well Details

Well ID: 0275022316000
Loading map...
Location: 00/16-23-027-02W5/0
Location Alias: 00/16-23-27-02 W5M
Location Alias 2: 00/16-23-027-02 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 23
County/Municipality: Rocky View County
Well Name: BONAVISTA CROSS 16-23-27-2
Operator Name: Bonavista Energy Corporation
License Number: 0020732
License Date: 1961-05-12
License Status: Suspension
Spud Date: 1961-05-19
Final Drill Date: 1961-06-06
Well Total Depth: 2153.40 m
Surface Hole Latitude: 51.327809
Surface Hole Longitude: -114.168195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-12 Obtained License
1961-06-06 Finished Drilling
1961-06-06 Well Mode changed to Drilled and Cased
1961-06-09 Production Casing Operation Performed
1961-06-13 Perforation Treatment Performed - Bullet Perforation
1961-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-14 Perforation Treatment Performed - Fractured
1961-06-24 Well Began Production
1961-06-24 Well Fluid changed to Crude Oil
1961-06-24 Well Mode changed to Flowing
1972-12-09 Perforation Treatment Performed - Fractured
1972-12-14 Well Fluid changed to Crude Oil
1972-12-14 Well Mode changed to Pumping
2000-11-02 Perforation Treatment Performed - Jet Perforation
2000-11-04 Perforation Treatment Performed - Fractured
2016-09-08 Well Fluid changed to Crude Oil
2016-09-08 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-13 Bullet Perforation 2062.30 2065.00 13
1961-06-14 Acid Treatment 2062.30 2065.00 0
1961-06-14 Fracture 2062.30 2065.00 0
1972-12-09 Fracture 2062.30 2065.00 0
2000-11-02 Perforation 2062.10 2064.90 17
2000-11-04 Fracture 2062.10 2064.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 744 0.0 0.0 0.0
1968 2878 0.0 0.0 0.0
1969 1039 0.0 0.0 0.0
1970 1308 0.0 0.0 0.0
1971 2368 0.0 0.0 0.0
1972 2108 0.0 0.0 0.0
1973 7903 0.0 0.0 0.0
1974 7750 0.0 0.0 0.0
1975 7406 0.0 0.0 0.0
1976 7916 0.0 0.0 0.0
1977 8075 0.0 0.0 0.0
1978 8371 0.0 0.0 0.0
1979 8384 0.0 0.0 0.0
1980 8511 0.0 0.0 0.0
1981 8495 0.0 0.0 0.0
1982 8627 0.0 0.0 0.0
1983 8593 0.0 0.0 0.0
1984 8377 0.0 0.0 0.0
1985 8615 0.0 0.0 0.0
1986 8372 0.0 0.0 0.0
1987 8734 0.0 0.0 0.0
1988 8603 0.0 0.0 0.0
1989 8481 0.0 0.0 0.0
1990 8133 0.0 0.0 0.0
1991 8751 0.0 0.0 0.0
1992 8591 0.0 0.0 0.0
1993 8543 0.0 0.0 0.0
1994 8279 0.0 0.0 0.0
1995 8662 0.0 0.0 0.0
1996 8780 0.0 0.0 0.0
1997 6546 0.0 0.0 0.0
1998 8641 0.0 0.0 0.0
1999 7152 0.0 0.0 0.0
2000 8159 0.0 0.0 0.0
2001 5729 0.0 0.0 0.0
2002 4496 0.0 0.0 0.0
2003 8705 0.0 0.0 0.0
2004 8157 0.0 0.0 0.0
2005 8145 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7676 0.0 0.0 0.0
2008 8663 0.0 0.0 0.0
2009 6749 0.0 0.0 0.0
2010 7996 0.0 0.0 0.0
2011 5833 0.0 0.0 0.0
2012 4072 0.0 0.0 0.0
2013 1104 0.0 0.0 0.0

For data sources see[5]

References