X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275061411002

Well Details

Well ID: 0275061411002
Loading map...
Location: 00/11-14-027-06W5/2
Location Alias: 00/11-14-27-06 W5M
Location Alias 2: 00/11-14-027-06 W5/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 06
Section: 14
County/Municipality: Stoney 142B
Well Name: Canlin WCATH 11-14-27-6
Operator Name: Canlin Energy Corporation
License Number: 0238146
License Date: 2000-06-02
License Status: Abandoned
Spud Date: 2000-07-16
Final Drill Date: 2000-08-08
Well Total Depth: 2691.00 m
Surface Hole Latitude: 51.309811
Surface Hole Longitude: -114.743926

For data sources see[1][2]

Well History

Date Event
2000-06-02 Obtained License
2000-07-18 Surface Casing Operation Performed
2000-07-19 Direction Drilling Operation Performed - Deviate
2000-08-08 Finished Drilling
2000-08-08 Well Log Performed
2000-08-08 Well Mode changed to Drilled and Cased
2000-08-09 Well Log Performed
2000-08-10 Well Log Performed
2000-08-13 Production Casing Operation Performed
2000-08-14 Rig Released
2000-09-18 Well Log Performed
2000-09-21 Perforation Treatment Performed - Jet Perforation
2000-09-21 Well Log Performed
2000-09-25 Perforation Treatment Performed - Chemical Squeeze
2000-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-26 Perforation Treatment Performed - Jet Perforation
2000-09-26 Well Log Performed
2000-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-27 Perforation Treatment Performed - Jet Perforation
2000-09-27 Well Log Performed
2000-09-29 Perforation Treatment Performed - Chemical Squeeze
2000-09-30 Perforation Treatment Performed - Jet Perforation
2000-09-30 Well Log Performed
2000-10-01 Perforation Treatment Performed - Chemical Squeeze
2000-10-02 Perforation Treatment Performed - Jet Perforation
2000-10-02 Well Log Performed
2000-10-05 Perforation Treatment Performed - Chemical Squeeze
2000-10-12 Perforation Treatment Performed - Fractured
2000-10-15 Perforation Treatment Performed - Jet Perforation
2000-10-15 Well Log Performed
2000-10-16 Well Log Performed
2000-10-17 Perforation Treatment Performed - Jet Perforation
2000-10-17 Well Log Performed
2000-10-18 Perforation Treatment Performed - Chemical Squeeze
2001-07-05 Well Log Performed
2002-02-01 Well Began Production
2002-02-01 Well Fluid changed to Gas
2002-02-01 Well Mode changed to Flowing
2008-10-20 Well Fluid changed to Gas
2008-10-20 Well Mode changed to Flowing
2012-09-24 Well Log Performed
2012-09-27 Perforation Treatment Performed - Cement Plug
2012-09-27 Plug Back Performed
2012-09-27 Well Fluid changed to Gas
2012-09-27 Well Mode changed to Abandoned Zone
2012-09-30 Well Abandoned
2012-09-30 Well Fluid changed to Gas
2012-09-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-19 343.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-21 Perforation 2657.50 2664.00 13
2000-09-29 Chemical Squeeze 1963.00 1983.00 0
2000-09-30 Perforation 1895.00 1898.00 13
2000-10-01 Chemical Squeeze 1895.00 1898.00 0
2000-10-02 Perforation 1586.00 1590.00 14
2000-10-05 Chemical Squeeze 1586.00 1590.00 0
2000-10-12 Fracture 1586.00 1590.00 0
2000-10-15 Perforation 1503.00 1505.50 14
2000-10-17 Perforation 1410.00 1417.00 14
2000-10-18 Chemical Squeeze 1410.00 1417.00 0
2012-09-27 Cement Plug 870.00 2000.00 0
2000-09-21 Perforation 2677.50 2679.00 13
2000-09-25 Chemical Squeeze 2657.50 2664.00 0
2000-09-26 Packing Device Capped w/Cement 2644.00 2652.00 0
2000-09-26 Perforation 2453.00 2455.00 13
2000-09-27 Packing Device Capped w/Cement 2437.00 2445.00 0
2000-09-27 Perforation 1978.50 1983.00 13
2000-09-27 Perforation 1974.50 1978.50 13
2000-09-27 Perforation 1963.00 1965.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6440 0.0 0.0 0.0
2003 3937 0.0 0.0 0.0
2004 4325 0.0 0.0 0.0
2005 3781 0.0 0.0 0.0
2006 4268 0.0 0.0 0.0
2007 7499 0.0 0.0 0.0
2008 8144 0.0 0.0 0.0
2009 7252 0.0 0.0 0.0
2010 7233 0.0 0.0 0.0
2011 4339 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-07-06 No Incident Encountered 0.00 0.00
2000-09-26 No Incident Encountered 0.00 0.00
2001-07-05 No Incident Encountered 0.00 0.00
2012-09-19 No Incident Encountered 0.00 0.00
2012-09-20 No Incident Encountered 0.00 0.00
2012-09-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References