X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251010000

Well Details

Well ID: 0284251010000
Loading map...
Location: 00/10-10-028-25W4/0
Location Alias: 00/10-10-28-25 W4M
Location Alias 2: 00/10-10-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 10
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 10-10-28-25
Operator Name: Ember Resources Inc.
License Number: 0368008
License Date: 2006-12-08
License Status: Issued
Spud Date: 2006-12-14
Final Drill Date: 2006-12-16
Well Total Depth: 737.00 m
Surface Hole Latitude: 51.380747
Surface Hole Longitude: -113.438346

For data sources see[1][2]

Well History

Date Event
2006-12-08 Obtained License
2006-12-14 Surface Casing Operation Performed
2006-12-16 Finished Drilling
2006-12-16 Production Casing Operation Performed
2006-12-16 Rig Released
2006-12-16 Well Mode changed to Drilled and Cased
2006-12-19 Well Log Performed
2007-02-03 Perforation Treatment Performed - Jet Perforation
2007-02-07 Perforation Treatment Performed - Fractured
2007-02-20 Well Began Production
2007-02-20 Well Fluid changed to Coalbed Methane-Coals and Other
2007-02-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-03 Perforation 617.70 618.20 13
2007-02-03 Perforation 551.50 552.00 13
2007-02-03 Perforation 542.80 543.30 13
2007-02-03 Perforation 534.00 534.50 13
2007-02-03 Perforation 510.90 511.90 13
2007-02-03 Perforation 504.90 505.40 13
2007-02-03 Perforation 488.00 489.00 13
2007-02-03 Perforation 483.60 484.10 13
2007-02-03 Perforation 465.20 465.70 13
2007-02-03 Perforation 460.50 461.00 13
2007-02-03 Perforation 457.70 458.20 13
2007-02-03 Perforation 610.10 611.10 13
2007-02-03 Perforation 453.40 453.90 13
2007-02-03 Perforation 432.70 433.70 13
2007-02-03 Perforation 383.30 383.80 13
2007-02-03 Perforation 321.70 322.20 13
2007-02-03 Perforation 318.90 319.40 13
2007-02-03 Perforation 208.70 209.20 13
2007-02-03 Perforation 519.00 521.00 13
2007-02-03 Perforation 443.50 445.50 13
2007-02-03 Perforation 438.50 440.50 13
2007-02-03 Perforation 330.00 332.00 13
2007-02-03 Perforation 591.10 592.10 13
2007-02-07 Fracture 208.70 618.20 0
2007-02-07 Fracture 330.00 521.00 0
2007-02-03 Perforation 581.40 581.90 13
2007-02-03 Perforation 578.80 579.80 13
2007-02-03 Perforation 574.10 574.60 13
2007-02-03 Perforation 565.00 566.00 13
2007-02-03 Perforation 563.20 563.70 13
2007-02-03 Perforation 561.20 561.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7508 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8700 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References