If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284251909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.409183,"lon":-113.503246,"icon":""}]} |
Location: 00/09-19-028-25W4/0 | |
Location Alias: 00/09-19-28-25 W4M | |
Location Alias 2: 00/09-19-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-19-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0367601 | |
License Date: 2006-12-05 | |
License Status: Issued | |
Spud Date: 2006-12-12 | |
Final Drill Date: 2006-12-17 | |
Well Total Depth: 754.00 m | |
Surface Hole Latitude: 51.409183 | |
Surface Hole Longitude: -113.503246 |
Date | Event |
---|---|
2006-12-05 | Obtained License |
2006-12-12 | Surface Casing Operation Performed |
2006-12-17 | Finished Drilling |
2006-12-17 | Production Casing Operation Performed |
2006-12-17 | Rig Released |
2006-12-17 | Well Mode changed to Drilled and Cased |
2006-12-21 | Well Log Performed |
2007-02-06 | Perforation Treatment Performed - Jet Perforation |
2007-02-11 | Perforation Treatment Performed - Fractured |
2007-03-02 | Well Began Production |
2007-03-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-03-02 | Well Mode changed to Flowing |
2007-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-10-04 | Plug Back Performed |
2009-09-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-02-06 | Perforation | 661.00 | 663.00 | 13 |
2007-02-06 | Perforation | 560.10 | 560.60 | 13 |
2007-02-06 | Perforation | 551.90 | 552.90 | 13 |
2007-02-06 | Perforation | 550.90 | 551.40 | 13 |
2007-02-06 | Perforation | 533.00 | 535.00 | 13 |
2007-02-06 | Perforation | 527.20 | 527.70 | 13 |
2007-02-06 | Perforation | 520.20 | 520.70 | 13 |
2007-02-06 | Perforation | 517.90 | 518.40 | 13 |
2007-02-06 | Perforation | 503.10 | 504.10 | 13 |
2007-02-06 | Perforation | 497.70 | 498.20 | 13 |
2007-02-06 | Perforation | 476.80 | 477.30 | 13 |
2007-02-06 | Perforation | 621.10 | 621.60 | 13 |
2007-02-06 | Perforation | 466.80 | 467.30 | 13 |
2007-02-06 | Perforation | 462.90 | 463.90 | 13 |
2007-02-06 | Perforation | 450.80 | 451.80 | 13 |
2007-02-06 | Perforation | 416.00 | 418.00 | 13 |
2007-02-06 | Perforation | 388.00 | 390.00 | 13 |
2007-02-06 | Perforation | 365.50 | 367.50 | 13 |
2007-02-06 | Perforation | 343.40 | 343.90 | 13 |
2007-02-06 | Perforation | 334.00 | 335.00 | 13 |
2007-02-06 | Perforation | 293.00 | 294.00 | 13 |
2007-02-06 | Perforation | 289.00 | 290.00 | 13 |
2007-02-06 | Perforation | 618.30 | 619.30 | 13 |
2007-02-06 | Perforation | 238.50 | 240.50 | 13 |
2007-02-11 | Fracture | 661.00 | 663.00 | 0 |
2007-02-11 | Fracture | 238.50 | 621.60 | 0 |
2007-10-04 | Packing Device Capped w/Cement | 647.00 | 655.00 | 0 |
2007-02-06 | Perforation | 605.00 | 606.00 | 13 |
2007-02-06 | Perforation | 595.70 | 596.20 | 13 |
2007-02-06 | Perforation | 593.20 | 593.70 | 13 |
2007-02-06 | Perforation | 587.60 | 588.10 | 13 |
2007-02-06 | Perforation | 576.30 | 577.30 | 13 |
2007-02-06 | Perforation | 564.90 | 565.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 7176 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 5663 | 0.0 | 0.0 | 0.0 |
2010 | 7960 | 0.0 | 0.0 | 0.0 |
2011 | 8673 | 0.0 | 0.0 | 0.0 |
2012 | 8762 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8600 | 0.0 | 0.0 | 0.0 |
2017 | 8575 | 0.0 | 0.0 | 0.0 |
2018 | 8671 | 0.0 | 0.0 | 0.0 |
2019 | 7288 | 0.0 | 0.0 | 0.0 |
2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]