X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285072808000

Well Details

Well ID: 0285072808000
Loading map...
Location: 00/08-28-028-07W5/0
Location Alias: 00/08-28-28-07 W5M
Location Alias 2: 00/08-28-028-07 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 07
Section: 28
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 8-28-28-7
Operator Name: Canlin Energy Corporation
License Number: 0254059
License Date: 2001-04-12
License Status: Amended
Spud Date: 2001-04-30
Final Drill Date: 2001-07-08
Well Total Depth: 3985.00 m
Surface Hole Latitude: 51.415920
Surface Hole Longitude: -114.939993

For data sources see[1][2]

Well History

Date Event
2001-04-12 Obtained License
2001-04-30 Direction Drilling Operation Performed - Deviate
2001-05-04 Surface Casing Operation Performed
2001-06-06 Well Log Performed
2001-07-08 Finished Drilling
2001-07-08 Well Log Performed
2001-07-09 Well Log Performed
2001-07-10 Well Log Performed
2001-07-14 Production Casing Operation Performed
2001-07-15 Well Log Performed
2001-07-16 Rig Released
2001-07-16 Well Mode changed to Drilled and Cased
2001-08-13 Well Log Performed
2001-08-14 Well Log Performed
2001-08-16 Perforation Treatment Performed - Jet Perforation
2001-08-16 Well Log Performed
2001-09-03 Perforation Treatment Performed - Chemical Squeeze
2001-09-08 Perforation Treatment Performed - Jet Perforation
2001-09-08 Well Log Performed
2001-09-09 Perforation Treatment Performed - Jet Perforation
2001-09-10 Perforation Treatment Performed - Chemical Squeeze
2001-09-12 Perforation Treatment Performed - Fractured
2001-09-15 Perforation Treatment Performed - Jet Perforation
2001-09-15 Well Log Performed
2001-09-16 Perforation Treatment Performed - Jet Perforation
2001-09-17 Perforation Treatment Performed - Chemical Squeeze
2001-10-01 Well Began Production
2001-10-01 Well Fluid changed to Gas
2001-10-01 Well Mode changed to Flowing
2001-10-20 Perforation Treatment Performed - Jet Perforation
2001-10-20 Well Log Performed
2001-10-21 Perforation Treatment Performed - Remedial Casing
2001-10-22 Perforation Treatment Performed - Jet Perforation
2001-10-22 Well Log Performed
2001-10-23 Perforation Treatment Performed - Remedial Casing
2001-10-31 Well Log Performed
2001-11-01 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-04-30 37.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-16 Perforation 3717.00 3723.00 13
2001-09-08 Perforation 3639.80 3649.00 13
2001-09-08 Perforation 3630.70 3639.80 13
2001-09-08 Perforation 3622.50 3630.70 13
2001-09-08 Perforation 3610.90 3620.00 13
2001-09-08 Perforation 3601.80 3607.50 13
2001-09-08 Perforation 3610.50 3610.90 13
2001-09-09 Perforation 3592.00 3594.00 13
2001-09-09 Perforation 3567.50 3569.00 13
2001-09-09 Perforation 3573.50 3578.00 13
2001-09-10 Chemical Squeeze 3573.50 3649.00 0
2001-08-16 Perforation 3711.00 3717.00 13
2001-09-12 Fracture 3573.50 3649.00 0
2001-09-15 Perforation 3525.90 3535.00 13
2001-09-15 Perforation 3522.00 3525.90 13
2001-09-15 Perforation 3519.00 3520.00 13
2001-09-15 Perforation 3508.00 3517.00 13
2001-09-15 Perforation 3495.00 3501.00 13
2001-09-15 Perforation 3506.00 3508.00 13
2001-09-15 Perforation 3488.00 3490.50 13
2001-09-15 Perforation 3493.00 3495.00 13
2001-09-16 Perforation 3466.00 3472.00 13
2001-08-16 Perforation 3701.00 3706.50 13
2001-09-16 Perforation 3483.00 3485.00 13
2001-09-16 Perforation 3460.00 3466.00 13
2001-09-17 Chemical Squeeze 3460.00 3535.00 0
2001-09-17 Chemical Squeeze 3460.00 3535.00 0
2001-10-20 Perforation 2494.00 2495.00 13
2001-10-20 Perforation 2399.00 2400.00 13
2001-10-21 Remedial Casing Cementing 2399.00 2400.00 0
2001-10-22 Perforation 1980.00 1981.00 13
2001-10-22 Perforation 1610.00 1611.00 13
2001-10-23 Remedial Casing Cementing 1610.00 1611.00 0
2001-08-16 Perforation 3695.00 3698.00 13
2001-11-01 Cement Squeeze 2494.00 2495.00 0
2001-11-01 Cement Squeeze 1980.00 1981.00 0
2001-08-16 Perforation 3688.50 3692.50 13
2001-08-16 Perforation 3684.00 3685.00 13
2001-08-16 Perforation 3678.50 3681.00 13
2001-08-16 Perforation 3667.00 3669.50 13
2001-09-03 Chemical Squeeze 3667.00 3723.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1202 0.0 0.0 0.0
2002 8707 0.0 0.0 0.0
2003 7581 0.0 0.0 0.0
2004 8575 0.0 0.0 0.0
2005 8196 0.0 0.0 0.0
2006 8611 0.0 0.0 0.0
2007 8674 0.0 0.0 0.0
2008 8666 0.0 0.0 0.0
2009 8559 0.0 0.0 0.0
2010 8592 0.0 0.0 0.0
2011 8337 0.0 0.0 0.0
2012 8531 0.0 0.0 0.0
2013 8472 0.0 0.0 0.0
2014 8179 0.0 0.0 0.0
2015 7697 0.0 0.0 0.0
2016 7597 0.0 0.0 0.0
2017 8397 0.0 0.0 0.0
2018 7492 0.0 0.0 0.0
2019 6260 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[6]

References