If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305060208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.537976,"lon":-114.7362,"icon":""}]} |
Location: 00/08-02-030-06W5/0 | |
Location Alias: 00/08-02-30-06 W5M | |
Location Alias 2: 00/08-02-030-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 06 | |
Section: 02 | |
County/Municipality: Municipal District of Bighorn No. 8 | |
Well Name: BP A-1 BOGGY 8-2-30-6 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0007535 | |
License Date: 1953-12-30 | |
License Status: RecExempt | |
Spud Date: 1953-12-30 | |
Final Drill Date: 1954-10-05 | |
Well Total Depth: 3420.50 m | |
Surface Hole Latitude: 51.537976 | |
Surface Hole Longitude: -114.736200 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-12-30 | Obtained License |
1954-09-01 | Production Casing Operation Performed |
1954-10-03 | Drill Stem Test Performed |
1954-10-05 | Drill Stem Test Performed |
1954-10-05 | Finished Drilling |
1954-10-06 | Perforation Treatment Performed - Cement Squeeze |
1954-10-06 | Perforation Treatment Performed - Jet Perforation |
1954-10-06 | Perforation Treatment Performed - Selective Jet Perforations |
1954-10-11 | Drill Stem Test Performed |
1954-10-12 | Perforation Treatment Performed - Cement Squeeze |
1954-10-13 | Perforation Treatment Performed - Cement Squeeze |
1954-10-13 | Perforation Treatment Performed - Jet Perforation |
1954-10-14 | Perforation Treatment Performed - Jet Perforation |
1954-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-10-16 | Perforation Treatment Performed - Jet Perforation |
1954-10-20 | Drill Stem Test Performed |
1954-10-21 | Drill Stem Test Performed |
1954-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-11-04 | Well Abandoned |
1954-11-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-10-06 | Selective Jet Perforations | 2261.60 | 2261.60 | 0 |
1954-10-31 | Packing Device Capped w/Cement | 1783.10 | 1828.80 | 0 |
1954-10-06 | Cement Squeeze | 2261.60 | 2261.60 | 0 |
1954-10-06 | Perforation | 2240.30 | 2252.50 | 13 |
1954-10-12 | Cement Squeeze | 2240.30 | 2252.50 | 0 |
1954-10-13 | Perforation | 2240.30 | 2252.50 | 13 |
1954-10-13 | Cement Squeeze | 2240.30 | 2252.50 | 0 |
1954-10-14 | Perforation | 2240.30 | 2252.50 | 13 |
1954-10-15 | Packing Device Capped w/Cement | 2225.00 | 2252.50 | 0 |
1954-10-16 | Perforation | 1897.40 | 1905.00 | 13 |
For data sources see[4]