X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314111306000

Well Details

Well ID: 0314111306000
Loading map...
Location: 00/06-13-031-11W4/0
Location Alias: 00/06-13-31-11 W4M
Location Alias 2: 00/06-13-031-11 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 11
Section: 13
County/Municipality: Special Areas No. 2
Well Name: QUASAR ET AL YNGSTN 6-13-31-11
Operator Name: Lightstream Resources Ltd.
License Number: 0067560
License Date: 1977-12-21
License Status: RecCertified
Spud Date: 1978-01-15
Final Drill Date: 1978-01-21
Well Total Depth: 1088.10 m
Surface Hole Latitude: 51.653476
Surface Hole Longitude: -111.438698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-21 Obtained License
1978-01-19 Drill Stem Test Performed
1978-01-21 Finished Drilling
1978-01-22 Drill Stem Test Performed
1978-01-23 Production Casing Operation Performed
1978-05-19 Perforation Treatment Performed - Jet Perforation
1978-05-24 Perforation Treatment Performed - Fractured
1978-08-17 Well Mode changed to Drilled and Cased
1985-05-23 Perforation Treatment Performed - Cement Squeeze
1985-05-23 Plug Back Performed
1985-05-26 Perforation Treatment Performed - Jet Perforation
1985-05-26 Well Log Performed
1985-05-27 Well Mode changed to Abandoned Zone
1985-08-30 Perforation Treatment Performed - Chemical Squeeze
1985-09-01 Perforation Treatment Performed - Chemical Squeeze
1993-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-19 Plug Back Performed
1993-09-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-05-19 Perforation 897.60 899.20 3
1985-09-01 Chemical Squeeze 1045.50 1051.10 0
1993-09-19 Packing Device Capped w/Cement 1032.00 1040.00 0
1978-05-19 Perforation 901.30 902.00 3
1978-05-19 Perforation 905.90 907.70 3
1978-05-19 Perforation 891.50 892.80 3
1978-05-24 Fracture 891.50 907.70 0
1985-05-23 Cement Squeeze 891.50 907.70 0
1985-05-26 Perforation 1045.50 1048.50 13
1985-05-26 Perforation 1050.30 1051.10 13
1985-08-30 Chemical Squeeze 1045.50 1051.10 0

For data sources see[4]



References