If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314240803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.636732,"lon":-113.376836,"icon":""}]} |
Location: 00/03-08-031-24W4/0 | |
Location Alias: 00/03-08-31-24 W4M | |
Location Alias 2: 00/03-08-031-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 24 | |
Section: 08 | |
County/Municipality: Kneehill County | |
Well Name: SIGNALTA ET AL TWINING 3-8-31-24 | |
Operator Name: Signalta Resources Limited | |
License Number: 0043844 | |
License Date: 1972-10-17 | |
License Status: RecCertified | |
Spud Date: 1972-10-18 | |
Final Drill Date: 1972-10-27 | |
Well Total Depth: 1732.80 m | |
Surface Hole Latitude: 51.636732 | |
Surface Hole Longitude: -113.376836 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-10-17 | Obtained License |
1972-10-27 | Finished Drilling |
1972-10-27 | Well Mode changed to Drilled and Cased |
1972-10-28 | Production Casing Operation Performed |
1972-11-14 | Perforation Treatment Performed - Jet Perforation |
1972-11-15 | Perforation Treatment Performed - Fractured |
1972-11-25 | Well Began Production |
1972-11-25 | Well Fluid changed to Crude Oil |
1972-11-25 | Well Mode changed to Pumping |
1977-10-28 | Well Fluid changed to Crude Oil |
1977-10-28 | Well Mode changed to Suspended |
1990-07-01 | Well Fluid changed to Crude Oil |
1990-07-01 | Well Mode changed to Pumping |
1994-09-01 | Well Fluid changed to Crude Oil |
1994-09-01 | Well Mode changed to Suspended |
1999-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-18 | Plug Back Performed |
1999-11-18 | Well Fluid changed to Crude Oil |
1999-11-18 | Well Mode changed to Abandoned Zone |
1999-11-19 | Perforation Treatment Performed - Jet Perforation |
1999-11-20 | Perforation Treatment Performed - Jet Perforation |
1999-11-20 | Well Log Performed |
2003-11-11 | Well Log Performed |
2003-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-12 | Plug Back Performed |
2003-11-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-11-14 | Perforation | 1709.30 | 1711.80 | 7 |
2003-11-12 | Packing Device Capped w/Cement | 820.00 | 828.00 | 0 |
1972-11-14 | Perforation | 1700.20 | 1703.80 | 7 |
1972-11-14 | Perforation | 1677.00 | 1678.20 | 7 |
1972-11-14 | Perforation | 1679.10 | 1682.20 | 7 |
1972-11-14 | Perforation | 1685.80 | 1688.00 | 7 |
1972-11-15 | Fracture | 1677.00 | 1711.80 | 0 |
1999-11-18 | Packing Device Capped w/Cement | 1647.00 | 1655.00 | 0 |
1999-11-19 | Perforation | 832.00 | 833.00 | 13 |
1999-11-20 | Perforation | 814.00 | 816.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 136 | 0.0 | 0.0 | 0.0 |
1973 | 1775 | 0.0 | 0.0 | 0.0 |
1974 | 2210 | 0.0 | 0.0 | 0.0 |
1975 | 2185 | 0.0 | 0.0 | 0.0 |
1976 | 748 | 0.0 | 0.0 | 0.0 |
1977 | 1727 | 0.0 | 0.0 | 0.0 |
1990 | 709 | 0.0 | 0.0 | 0.0 |
1991 | 528 | 0.0 | 0.0 | 0.0 |
For data sources see[5]