If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354103603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.043121,"lon":-111.305329,"icon":""}]} |
Location: 00/03-36-035-10W4/0 | |
Location Alias: 00/03-36-35-10 W4M | |
Location Alias 2: 00/03-36-035-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 10 | |
Section: 36 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: FCE ET AL HAMIL 3-36-35-10 | |
Operator Name: Karve Energy Inc. | |
License Number: 0030974 | |
License Date: 1966-09-14 | |
License Status: Abandoned | |
Spud Date: 1966-09-14 | |
Final Drill Date: 1966-09-17 | |
Well Total Depth: 908.90 m | |
Surface Hole Latitude: 52.043121 | |
Surface Hole Longitude: -111.305329 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-09-14 | Obtained License |
1966-09-17 | Finished Drilling |
1966-09-17 | Well Mode changed to Drilled and Cased |
1966-09-18 | Production Casing Operation Performed |
1967-09-21 | Perforation Treatment Performed - Jet Perforation |
1967-09-22 | Perforation Treatment Performed - Fractured |
1967-10-03 | Well Began Production |
1967-10-03 | Well Fluid changed to Crude Oil |
1967-10-03 | Well Mode changed to Pumping |
1975-12-08 | Well Began Injection |
1975-12-08 | Well Fluid changed to Water |
1975-12-08 | Well Type changed to Injection |
1998-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-06-04 | Plug Back Performed |
1998-06-04 | Well Fluid changed to Water |
1998-06-04 | Well Log Performed |
1998-06-04 | Well Mode changed to Abandoned Zone |
1998-06-04 | Well Type changed to Injection |
2010-02-01 | Well Log Performed |
2010-02-03 | Perforation Treatment Performed - Jet Perforation |
2010-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-02-04 | Perforation Treatment Performed - Remedial Casing |
2010-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-02-08 | Perforation Treatment Performed - Jet Perforation |
2010-02-08 | Well Log Performed |
2010-02-26 | Well Log Performed |
2010-02-27 | Perforation Treatment Performed - Jet Perforation |
2010-02-28 | Perforation Treatment Performed - Cement Plug |
2010-03-01 | Well Log Performed |
2010-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-10 | Well Abandoned |
2010-03-10 | Well Fluid changed to Water |
2010-03-10 | Well Mode changed to Abandoned |
2010-03-10 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-09-21 | Perforation | 892.10 | 893.40 | 13 |
2010-02-08 | Perforation | 370.00 | 371.00 | 14 |
2010-02-27 | Perforation | 120.40 | 121.40 | 14 |
2010-02-27 | Perforation | 150.90 | 151.90 | 14 |
2010-02-27 | Perforation | 192.00 | 193.00 | 14 |
2010-02-27 | Perforation | 231.60 | 232.60 | 14 |
2010-02-28 | Cement Plug | 126.80 | 386.00 | 0 |
2010-03-02 | Packing Device Capped w/Cement | 110.00 | 118.00 | 0 |
1967-09-22 | Fracture | 892.10 | 893.40 | 0 |
1998-06-04 | Packing Device Capped w/Cement | 843.00 | 845.00 | 0 |
1998-06-04 | Packing Device Capped w/Cement | 632.50 | 640.00 | 0 |
2010-02-03 | Perforation | 570.00 | 571.00 | 14 |
2010-02-04 | Remedial Casing Cementing | 570.00 | 571.00 | 0 |
2010-02-04 | Packing Device Capped w/Cement | 545.00 | 567.00 | 0 |
2010-02-08 | Perforation | 395.00 | 396.00 | 14 |
2010-02-08 | Packing Device Capped w/Cement | 384.00 | 392.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 1424 | 0.0 | 0.0 | 0.0 |
1968 | 3632 | 0.0 | 0.0 | 0.0 |
1969 | 1594 | 0.0 | 0.0 | 0.0 |
1970 | 5281 | 0.0 | 0.0 | 0.0 |
1971 | 7805 | 0.0 | 0.0 | 0.0 |
1972 | 8609 | 0.0 | 0.0 | 0.0 |
1973 | 8009 | 0.0 | 0.0 | 0.0 |
1974 | 8518 | 0.0 | 0.0 | 0.0 |
1975 | 7453 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]