X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354111112000

Well Details

Well ID: 0354111112000
Loading map...
Location: 00/12-11-035-11W4/0
Location Alias: 00/12-11-35-11 W4M
Location Alias 2: 00/12-11-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: WHITEHALL ET AL PROVO 12-11-35-11
Operator Name: Canadian Natural Resources Limited
License Number: 0037296
License Date: 1969-12-01
License Status: RecCertified
Spud Date: 1969-12-27
Final Drill Date: 1969-12-30
Well Total Depth: 919.90 m
Surface Hole Latitude: 51.992130
Surface Hole Longitude: -111.477564

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-01 Obtained License
1969-12-30 Finished Drilling
1969-12-30 Production Casing Operation Performed
1969-12-30 Well Mode changed to Drilled and Cased
1970-09-16 Perforation Treatment Performed - Jet Perforation
1970-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-22 Perforation Treatment Performed - Fractured
1970-10-09 Well Began Production
1970-10-09 Well Fluid changed to Crude Oil
1970-10-09 Well Mode changed to Pumping
1971-05-14 Well Began Injection
1971-05-14 Well Fluid changed to Water
1971-05-14 Well Type changed to Injection
1972-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-21 Well Fluid changed to Water
1972-06-21 Well Mode changed to Suspended
1972-06-21 Well Type changed to Injection
1973-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-10-27 Well Abandoned
1973-10-27 Well Fluid changed to Water
1973-10-27 Well Mode changed to Abandoned
1973-10-27 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-09-16 Perforation 900.10 901.60 13
1970-09-18 Acid Treatment 900.10 901.60 0
1970-09-22 Fracture 900.10 901.60 0
1972-03-06 Acid Treatment 900.10 901.60 0
1973-10-27 Packing Device Capped w/Cement 887.00 887.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1840 0.0 0.0 0.0
1971 2853 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[5]

References