If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364112106020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.115436,"lon":-111.503584,"icon":""}]} |
Location: 02/06-21-036-11W4/0 | |
Location Alias: 02/06-21-36-11 W4M | |
Location Alias 2: 02/06-21-036-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 11 | |
Section: 21 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: TORO 102 HZ PROVOST 6-21-36-11 | |
Operator Name: Steelhead Petroleum Ltd. | |
License Number: 0476048 | |
License Date: 2015-07-09 | |
License Status: Amended | |
Spud Date: 2015-07-28 | |
Final Drill Date: 2015-07-31 | |
Well Total Depth: 2688.00 m | |
Surface Hole Latitude: 52.115436 | |
Surface Hole Longitude: -111.503584 |
Date | Event |
---|---|
2015-07-09 | Obtained License |
2015-07-28 | Surface Casing Operation Performed |
2015-07-29 | Direction Drilling Operation Performed - Deviate |
2015-07-30 | Direction Drilling Operation Performed - Horizontal |
2015-07-30 | Well Log Performed |
2015-07-31 | Finished Drilling |
2015-07-31 | Well Mode changed to Drilled and Cased |
2015-08-01 | Production Casing Operation Performed |
2015-08-01 | Well Log Performed |
2015-08-02 | Rig Released |
2015-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-01 | Well Began Production |
2015-09-01 | Well Fluid changed to Crude Oil |
2015-09-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-07-29 | 681.50 | Deviate (5 - 79 degrees) |
2015-07-30 | 1022.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-08-10 | Multi-Stage Fracture | 1079.10 | 1079.40 | 0 |
2015-08-10 | Multi-Stage Fracture | 1446.30 | 1446.60 | 0 |
2015-08-10 | Multi-Stage Fracture | 1487.10 | 1487.40 | 0 |
2015-08-10 | Multi-Stage Fracture | 1527.80 | 1528.10 | 0 |
2015-08-10 | Multi-Stage Fracture | 1568.70 | 1569.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 1609.40 | 1609.70 | 0 |
2015-08-10 | Multi-Stage Fracture | 1650.20 | 1650.50 | 0 |
2015-08-10 | Multi-Stage Fracture | 1690.90 | 1691.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 1731.70 | 1732.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 1772.20 | 1772.50 | 0 |
2015-08-10 | Multi-Stage Fracture | 1812.90 | 1813.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 1119.90 | 1120.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 1853.70 | 1854.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 1894.50 | 1894.80 | 0 |
2015-08-10 | Multi-Stage Fracture | 1935.40 | 1935.70 | 0 |
2015-08-10 | Multi-Stage Fracture | 1976.10 | 1976.40 | 0 |
2015-08-10 | Multi-Stage Fracture | 2016.90 | 2017.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 2057.50 | 2057.80 | 0 |
2015-08-10 | Multi-Stage Fracture | 2098.30 | 2098.60 | 0 |
2015-08-10 | Multi-Stage Fracture | 2139.00 | 2139.30 | 0 |
2015-08-10 | Multi-Stage Fracture | 2179.90 | 2180.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 2220.70 | 2221.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 1160.70 | 1161.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 2261.40 | 2261.70 | 0 |
2015-08-10 | Multi-Stage Fracture | 2302.20 | 2302.50 | 0 |
2015-08-10 | Multi-Stage Fracture | 2342.90 | 2343.20 | 0 |
2015-08-10 | Multi-Stage Fracture | 2383.70 | 2384.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 2424.50 | 2424.80 | 0 |
2015-08-10 | Multi-Stage Fracture | 2465.20 | 2465.50 | 0 |
2015-08-10 | Multi-Stage Fracture | 2506.00 | 2506.30 | 0 |
2015-08-10 | Multi-Stage Fracture | 2546.80 | 2547.10 | 0 |
2015-08-10 | Multi-Stage Fracture | 2587.60 | 2587.90 | 0 |
2015-08-10 | Multi-Stage Fracture | 2628.30 | 2628.60 | 0 |
2015-08-10 | Multi-Stage Fracture | 1201.50 | 1201.80 | 0 |
2015-08-10 | Multi-Stage Fracture | 2669.10 | 2669.40 | 0 |
2015-08-10 | Multi-Stage Fracture | 1038.40 | 1038.70 | 0 |
2015-08-10 | Multi-Stage Fracture | 1242.20 | 1242.50 | 0 |
2015-08-10 | Multi-Stage Fracture | 1283.00 | 1283.30 | 0 |
2015-08-10 | Multi-Stage Fracture | 1323.80 | 1324.10 | 0 |
2015-08-10 | Multi-Stage Fracture | 1364.70 | 1365.00 | 0 |
2015-08-10 | Multi-Stage Fracture | 1405.60 | 1405.90 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-10 | 2015-08-10 | 916 | 1,826 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 100 | N/A | |||
Sand | Canfrac Sands Ltd. | silica crystalline | 14808-60-7 | 100 | 12.3475 | N/A | ||
Myacide 2K7 | BASF | Bactericide/Biocide | Bronopol | 52-51-7 | 100 | 0.005 | N/A | |
CC2 | Weatherford | Clay Control | Choline chloride | 67-48-1 | 100 | 0.4 | N/A | |
Water | Not Available | 100 | 0.4 | N/A | ||||
NE2 | Weatherford | Demulsifier | Methanol | 67-56-1 | 100 | 0.1 | N/A | |
Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio l |
52624-57-4 | 100 | 0.1 | N/A | ||||
Propanetriol polymer with propylene oxide-ethylene oxide | 9082-00-2 | 100 | 0.1 | N/A | ||||
Water | Not Available | 100 | 0.1 | N/A | ||||
FR5 | SNF | Friction Reducer | 2-Propenoic acid. polymer with 2-propenamide. sodium salt | 25987-30-8 | 100 | 0.13 | N/A | |
Acrylamide (residual) | 79-06-1 | 100 | 0.13 | N/A | ||||
Alcohols. C11-14-iso-.C13-rich. ethoxylated | 78330-21-9 | 100 | 0.13 | N/A | ||||
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.13 | N/A | ||||
Sodium acetate | 126-96-5 | 100 | 0.13 | N/A | ||||
Sorbitan monooleale | 1338-43-8 | 100 | 0.13 | N/A | ||||
Sorbitan monooleate. ethoxylated | 9005-65-6 | 100 | 0.13 | N/A | ||||
Water | Not Available | 100 | 0.13 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2397 | 0.0 | 0.0 | 0.0 |
2016 | 8379 | 0.0 | 0.0 | 0.0 |
2017 | 7789 | 0.0 | 0.0 | 0.0 |
2018 | 8498 | 0.0 | 0.0 | 0.0 |
2019 | 8732 | 0.0 | 0.0 | 0.0 |
2020 | 1968 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]