X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364112106020

Well Details

Well ID: 0364112106020
Loading map...
Location: 02/06-21-036-11W4/0
Location Alias: 02/06-21-36-11 W4M
Location Alias 2: 02/06-21-036-11 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 11
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: TORO 102 HZ PROVOST 6-21-36-11
Operator Name: Steelhead Petroleum Ltd.
License Number: 0476048
License Date: 2015-07-09
License Status: Amended
Spud Date: 2015-07-28
Final Drill Date: 2015-07-31
Well Total Depth: 2688.00 m
Surface Hole Latitude: 52.115436
Surface Hole Longitude: -111.503584

For data sources see[1][2]

Well History

Date Event
2015-07-09 Obtained License
2015-07-28 Surface Casing Operation Performed
2015-07-29 Direction Drilling Operation Performed - Deviate
2015-07-30 Direction Drilling Operation Performed - Horizontal
2015-07-30 Well Log Performed
2015-07-31 Finished Drilling
2015-07-31 Well Mode changed to Drilled and Cased
2015-08-01 Production Casing Operation Performed
2015-08-01 Well Log Performed
2015-08-02 Rig Released
2015-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-01 Well Began Production
2015-09-01 Well Fluid changed to Crude Oil
2015-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-07-29 681.50 Deviate (5 - 79 degrees)
2015-07-30 1022.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-10 Multi-Stage Fracture 1079.10 1079.40 0
2015-08-10 Multi-Stage Fracture 1446.30 1446.60 0
2015-08-10 Multi-Stage Fracture 1487.10 1487.40 0
2015-08-10 Multi-Stage Fracture 1527.80 1528.10 0
2015-08-10 Multi-Stage Fracture 1568.70 1569.00 0
2015-08-10 Multi-Stage Fracture 1609.40 1609.70 0
2015-08-10 Multi-Stage Fracture 1650.20 1650.50 0
2015-08-10 Multi-Stage Fracture 1690.90 1691.20 0
2015-08-10 Multi-Stage Fracture 1731.70 1732.00 0
2015-08-10 Multi-Stage Fracture 1772.20 1772.50 0
2015-08-10 Multi-Stage Fracture 1812.90 1813.20 0
2015-08-10 Multi-Stage Fracture 1119.90 1120.20 0
2015-08-10 Multi-Stage Fracture 1853.70 1854.00 0
2015-08-10 Multi-Stage Fracture 1894.50 1894.80 0
2015-08-10 Multi-Stage Fracture 1935.40 1935.70 0
2015-08-10 Multi-Stage Fracture 1976.10 1976.40 0
2015-08-10 Multi-Stage Fracture 2016.90 2017.20 0
2015-08-10 Multi-Stage Fracture 2057.50 2057.80 0
2015-08-10 Multi-Stage Fracture 2098.30 2098.60 0
2015-08-10 Multi-Stage Fracture 2139.00 2139.30 0
2015-08-10 Multi-Stage Fracture 2179.90 2180.20 0
2015-08-10 Multi-Stage Fracture 2220.70 2221.00 0
2015-08-10 Multi-Stage Fracture 1160.70 1161.00 0
2015-08-10 Multi-Stage Fracture 2261.40 2261.70 0
2015-08-10 Multi-Stage Fracture 2302.20 2302.50 0
2015-08-10 Multi-Stage Fracture 2342.90 2343.20 0
2015-08-10 Multi-Stage Fracture 2383.70 2384.00 0
2015-08-10 Multi-Stage Fracture 2424.50 2424.80 0
2015-08-10 Multi-Stage Fracture 2465.20 2465.50 0
2015-08-10 Multi-Stage Fracture 2506.00 2506.30 0
2015-08-10 Multi-Stage Fracture 2546.80 2547.10 0
2015-08-10 Multi-Stage Fracture 2587.60 2587.90 0
2015-08-10 Multi-Stage Fracture 2628.30 2628.60 0
2015-08-10 Multi-Stage Fracture 1201.50 1201.80 0
2015-08-10 Multi-Stage Fracture 2669.10 2669.40 0
2015-08-10 Multi-Stage Fracture 1038.40 1038.70 0
2015-08-10 Multi-Stage Fracture 1242.20 1242.50 0
2015-08-10 Multi-Stage Fracture 1283.00 1283.30 0
2015-08-10 Multi-Stage Fracture 1323.80 1324.10 0
2015-08-10 Multi-Stage Fracture 1364.70 1365.00 0
2015-08-10 Multi-Stage Fracture 1405.60 1405.90 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-10 2015-08-10 916 1,826 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 100 N/A
Sand Canfrac Sands Ltd. silica crystalline 14808-60-7 100 12.3475 N/A
Myacide 2K7 BASF Bactericide/Biocide Bronopol 52-51-7 100 0.005 N/A
CC2 Weatherford Clay Control Choline chloride 67-48-1 100 0.4 N/A
Water Not Available 100 0.4 N/A
NE2 Weatherford Demulsifier Methanol 67-56-1 100 0.1 N/A
Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio
l
52624-57-4 100 0.1 N/A
Propanetriol polymer with propylene oxide-ethylene oxide 9082-00-2 100 0.1 N/A
Water Not Available 100 0.1 N/A
FR5 SNF Friction Reducer 2-Propenoic acid. polymer with 2-propenamide. sodium salt 25987-30-8 100 0.13 N/A
Acrylamide (residual) 79-06-1 100 0.13 N/A
Alcohols. C11-14-iso-.C13-rich. ethoxylated 78330-21-9 100 0.13 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.13 N/A
Sodium acetate 126-96-5 100 0.13 N/A
Sorbitan monooleale 1338-43-8 100 0.13 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.13 N/A
Water Not Available 100 0.13 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2397 0.0 0.0 0.0
2016 8379 0.0 0.0 0.0
2017 7789 0.0 0.0 0.0
2018 8498 0.0 0.0 0.0
2019 8732 0.0 0.0 0.0
2020 1968 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References