X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365043015003

Well Details

Well ID: 0365043015003
Loading map...
Location: 00/15-30-036-04W5/3
Location Alias: 00/15-30-36-04 W5M
Location Alias 2: 00/15-30-036-04 W5/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 04
Section: 30
County/Municipality: Red Deer County
Well Name: SITKA EXPL SYLAKE 15-30-36-4
Operator Name: Sitka Exploration Ltd.
License Number: 0349427
License Date: 2006-01-19
License Status: Issued
Spud Date: 2006-02-03
Final Drill Date: 2006-02-14
Well Total Depth: 2544.00 m
Surface Hole Latitude: 52.128692
Surface Hole Longitude: -114.557405

For data sources see[1][2]

Well History

Date Event
2006-01-19 Obtained License
2006-02-05 Surface Casing Operation Performed
2006-02-08 Direction Drilling Operation Performed - Deviate
2006-02-14 Finished Drilling
2006-02-14 Well Log Performed
2006-02-14 Well Mode changed to Drilled and Cased
2006-02-15 Well Log Performed
2006-02-17 Production Casing Operation Performed
2006-02-17 Rig Released
2006-03-05 Well Log Performed
2006-03-06 Well Log Performed
2006-03-08 Perforation Treatment Performed - Jet Perforation
2006-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-13 Well Log Performed
2006-03-14 Perforation Treatment Performed - Jet Perforation
2006-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-04-07 Plug Back Performed
2007-06-10 Perforation Treatment Performed - Jet Perforation
2007-06-10 Well Log Performed
2007-07-24 Perforation Treatment Performed - Fractured
2007-08-01 Well Log Performed
2007-08-04 Perforation Treatment Performed - Jet Perforation
2007-08-04 Well Log Performed
2007-08-26 Perforation Treatment Performed - Fractured
2008-02-16 Well Began Production
2008-02-16 Well Fluid changed to Crude Oil
2008-02-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-02-08 1750.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-08 Perforation 2501.00 2502.50 20
2007-08-04 Perforation 2430.00 2433.00 17
2007-08-26 Fracture 2430.00 2433.00 0
2006-03-10 Acid Treatment 2501.00 2502.50 0
2006-03-11 Acid Treatment 2501.00 2502.50 0
2006-03-14 Perforation 2501.50 2506.50 17
2006-03-15 Acid Treatment 2501.50 2506.50 0
2007-04-07 Packing Device Capped w/Cement 2487.00 2495.00 0
2007-06-10 Perforation 2480.00 2483.50 17
2007-07-24 Fracture 2480.00 2483.50 0
2007-08-04 Perforation 2438.00 2441.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4780 0.0 0.0 0.0
2009 6778 0.0 0.0 0.0
2010 7540 0.0 0.0 0.0
2011 7923 0.0 0.0 0.0
2012 8159 0.0 0.0 0.0
2013 6889 0.0 0.0 0.0
2014 7859 0.0 0.0 0.0
2015 8329 0.0 0.0 0.0
2016 8448 0.0 0.0 0.0
2017 7973 0.0 0.0 0.0
2018 6737 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References