X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041110000

Well Details

Well ID: 0375041110000
Loading map...
Location: 00/10-11-037-04W5/0
Location Alias: 00/10-11-37-04 W5M
Location Alias 2: 00/10-11-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 11
County/Municipality: Clearwater County
Well Name: GAO CZAR ET AL SYLAKE 10-11-37-4
Operator Name: Phillips Petroleum Resources, Ltd.
License Number: 0073783
License Date: 1979-01-05
License Status: RecCertified
Spud Date: 1979-01-12
Final Drill Date: 1979-01-30
Well Total Depth: 2470.00 m
Surface Hole Latitude: 52.169384
Surface Hole Longitude: -114.461522

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-05 Obtained License
1979-01-14 Lost Circulation Occurred
1979-01-26 Drill Stem Test Performed
1979-01-30 Finished Drilling
1979-01-30 Well Log Performed
1979-01-30 Well Mode changed to Drilled and Cased
1979-02-01 Drill Stem Test Performed
1979-02-03 Drill Stem Test Performed
1979-02-05 Production Casing Operation Performed
1979-03-05 Perforation Treatment Performed - Jet Perforation
1979-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-09 Perforation Treatment Performed - Jet Perforation
1979-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-02 Well Began Production
1979-07-02 Well Fluid changed to Crude Oil
1979-07-02 Well Mode changed to Pumping
1980-09-04 Well Fluid changed to Crude Oil
1980-09-04 Well Mode changed to Suspended
1989-05-06 Well Fluid changed to Crude Oil
1989-05-06 Well Mode changed to Pumping
1989-05-09 Well Log Performed
1989-05-10 Perforation Treatment Performed - Jet Perforation
1989-05-11 Perforation Treatment Performed - Jet Perforation
1989-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-16 Well Fluid changed to Crude Oil
1989-05-16 Well Mode changed to Suspended
1989-07-17 Well Log Performed
1989-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-18 Plug Back Performed
1989-07-18 Well Fluid changed to Crude Oil
1989-07-18 Well Mode changed to Abandoned
1989-07-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-05 Perforation 2347.00 2349.00 3
1989-05-10 Perforation 2325.00 2327.50 13
1989-05-11 Perforation 2313.80 2314.80 13
1989-05-11 Perforation 2318.00 2320.00 13
1989-05-12 Acid Treatment 2313.00 2327.50 0
1989-07-18 Packing Device Capped w/Cement 2292.00 2300.00 0
1979-03-05 Perforation 2350.00 2352.00 3
1979-03-06 Acid Treatment 2347.00 2352.00 0
1979-03-08 Packing Device Capped w/Cement 2336.30 2344.00 0
1979-03-09 Perforation 2325.00 2326.00 3
1979-03-09 Perforation 2326.00 2327.00 3
1979-03-09 Perforation 2318.00 2320.00 3
1979-03-09 Perforation 2313.00 2314.00 3
1979-03-10 Acid Treatment 2313.00 2327.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2589 0.0 0.0 0.0
1980 759 0.0 0.0 0.0
1989 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-14 Lost Circulation 261.00 261.00

For data sources see[6]

References