If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384131407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.263487,"lon":-111.751527,"icon":""}]} |
Location: 00/07-14-038-13W4/0 | |
Location Alias: 00/07-14-38-13 W4M | |
Location Alias 2: 00/07-14-038-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 13 | |
Section: 14 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: PIONEER CANADA PROVOST 7-14-38-13 | |
Operator Name: TAQA North Ltd. | |
License Number: 0062312 | |
License Date: 1977-01-21 | |
License Status: RecCertified | |
Spud Date: 1977-01-24 | |
Final Drill Date: 1977-01-29 | |
Well Total Depth: 1075.90 m | |
Surface Hole Latitude: 52.263487 | |
Surface Hole Longitude: -111.751527 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-01-21 | Obtained License |
1977-01-27 | Drill Stem Test Performed |
1977-01-28 | Drill Stem Test Performed |
1977-01-29 | Finished Drilling |
1977-01-30 | Production Casing Operation Performed |
1977-01-31 | Well Mode changed to Drilled and Cased |
1977-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-05-31 | Perforation Treatment Performed - Jet Perforation |
1980-12-12 | Well Began Production |
1980-12-12 | Well Fluid changed to Gas |
1980-12-12 | Well Mode changed to Flowing |
1983-05-22 | Well Fluid changed to Gas |
1983-05-22 | Well Mode changed to Suspended |
1985-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-03-14 | Plug Back Performed |
1985-03-14 | Well Fluid changed to Gas |
1985-03-14 | Well Log Performed |
1985-03-14 | Well Mode changed to Abandoned Zone |
1985-03-15 | Perforation Treatment Performed - Jet Perforation |
1985-03-15 | Well Log Performed |
1992-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-25 | Perforation Treatment Performed - Jet Perforation |
1992-06-25 | Perforation Treatment Performed - Remedial Casing |
1992-06-25 | Plug Back Performed |
1992-06-25 | Well Abandoned |
1992-06-25 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-05-31 | Perforation | 998.20 | 1000.40 | 13 |
1977-05-31 | Acid Treatment | 998.20 | 1000.40 | 0 |
1985-03-14 | Packing Device Capped w/Cement | 990.00 | 990.00 | 0 |
1985-03-15 | Perforation | 879.30 | 883.30 | 7 |
1992-06-25 | Packing Device Capped w/Cement | 869.00 | 877.00 | 0 |
1992-06-25 | Perforation | 282.00 | 282.20 | 13 |
1992-06-25 | Remedial Casing Cementing | 282.00 | 282.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 210 | 0.0 | 0.0 | 0.0 |
1981 | 5310 | 0.0 | 0.0 | 0.0 |
1982 | 3276 | 0.0 | 0.0 | 0.0 |
For data sources see[5]