X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385070106020

Well Details

Well ID: 0385070106020
Loading map...
Location: 02/06-01-038-07W5/0
Location Alias: 02/06-01-38-07 W5M
Location Alias 2: 02/06-01-038-07 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 07
Section: 01
County/Municipality: Clearwater County
Well Name: OUC FERRIER 6-1-38-7
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0418316
License Date: 2010-02-04
License Status: Issued
Spud Date: 2010-03-19
Final Drill Date: 2010-04-05
Well Total Depth: 3384.00 m
Surface Hole Latitude: 52.247956
Surface Hole Longitude: -114.869313

For data sources see[1][2]

Well History

Date Event
2010-02-04 Obtained License
2010-03-22 Surface Casing Operation Performed
2010-03-27 Direction Drilling Operation Performed - Horizontal
2010-03-28 Well Log Performed
2010-03-31 Intermediate Casing Operation Performed
2010-04-05 Finished Drilling
2010-04-05 Well Log Performed
2010-04-05 Well Mode changed to Drilled and Cased
2010-04-14 Perforation Treatment Performed - Open-Hole Completion
2010-04-17 Rig Released
2010-05-11 Liner Casing Operation Performed
2010-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-06-03 Well Log Performed
2010-06-20 Well Began Production
2010-06-20 Well Fluid changed to Crude Oil
2010-06-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-27 1846.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-14 Open Hole/Barefoot Completion 3356.00 3384.00 0
2010-05-25 Multi-Stage Fracture 2579.80 2579.90 0
2010-05-25 Multi-Stage Fracture 2490.30 2490.40 0
2010-05-25 Multi-Stage Fracture 2400.00 2400.10 0
2010-05-25 Multi-Stage Fracture 3327.80 3327.90 0
2010-05-25 Multi-Stage Fracture 3275.10 3275.20 0
2010-05-25 Multi-Stage Fracture 3160.90 3161.00 0
2010-05-25 Multi-Stage Fracture 3070.90 3071.00 0
2010-05-25 Multi-Stage Fracture 2980.20 2980.30 0
2010-05-25 Multi-Stage Fracture 2877.20 2877.30 0
2010-05-25 Multi-Stage Fracture 2773.50 2773.60 0
2010-05-25 Multi-Stage Fracture 2670.10 2670.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4627 0.0 0.0 0.0
2011 8654 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 7937 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 8622 0.0 0.0 0.0
2018 8690 0.0 0.0 0.0
2019 8515 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[6]

References