If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385093312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.314442,"lon":-115.235422,"icon":""}]} |
Location: 00/12-33-038-09W5/0 | |
Location Alias: 00/12-33-38-09 W5M | |
Location Alias 2: 00/12-33-038-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 09 | |
Section: 33 | |
County/Municipality: Clearwater County | |
Well Name: BIRCHEX STRACHAN 12-33-38-9 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0411157 | |
License Date: 2009-06-25 | |
License Status: Issued | |
Spud Date: 2009-07-22 | |
Final Drill Date: 2009-08-14 | |
Well Total Depth: 3095.00 m | |
Surface Hole Latitude: 52.314442 | |
Surface Hole Longitude: -115.235422 |
Date | Event |
---|---|
2009-06-25 | Obtained License |
2009-07-25 | Surface Casing Operation Performed |
2009-08-05 | Well Log Performed |
2009-08-06 | Intermediate Casing Operation Performed |
2009-08-14 | Finished Drilling |
2009-08-14 | Well Mode changed to Drilled and Cased |
2009-08-15 | Well Log Performed |
2009-08-16 | Liner Casing Operation Performed |
2009-08-17 | Rig Released |
2009-11-19 | Perforation Treatment Performed - Jet Perforation |
2009-11-22 | Perforation Treatment Performed - Fractured |
2009-11-23 | Perforation Treatment Performed - Jet Perforation |
2009-11-25 | Perforation Treatment Performed - Fractured |
2009-12-04 | Perforation Treatment Performed - Jet Perforation |
2009-12-06 | Perforation Treatment Performed - Fractured |
2009-12-12 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2011-01-22 | Well Began Production |
2011-01-22 | Well Fluid changed to Gas |
2011-01-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-19 | Perforation | 3035.00 | 3039.00 | 17 |
2009-12-06 | Fracture | 1946.50 | 1954.00 | 0 |
2009-12-12 | Casing Patch | 1946.50 | 1954.00 | 0 |
2009-11-19 | Perforation | 3000.50 | 3005.00 | 17 |
2009-11-22 | Fracture | 3035.00 | 3039.00 | 0 |
2009-11-22 | Fracture | 3000.50 | 3005.00 | 0 |
2009-11-23 | Perforation | 2819.00 | 2822.00 | 17 |
2009-11-23 | Perforation | 2489.50 | 2493.00 | 17 |
2009-11-25 | Fracture | 2819.00 | 2822.00 | 0 |
2009-11-25 | Fracture | 2489.50 | 2493.00 | 0 |
2009-12-04 | Perforation | 1946.50 | 1954.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7736 | 0.0 | 0.0 | 0.0 |
2012 | 7439 | 0.0 | 0.0 | 0.0 |
2013 | 7826 | 0.0 | 0.0 | 0.0 |
2014 | 4502 | 0.0 | 0.0 | 0.0 |
2015 | 5026 | 0.0 | 0.0 | 0.0 |
2016 | 6416 | 0.0 | 0.0 | 0.0 |
2017 | 7329 | 0.0 | 0.0 | 0.0 |
2018 | 8386 | 0.0 | 0.0 | 0.0 |
2019 | 8499 | 0.0 | 0.0 | 0.0 |
2020 | 905 | 0.0 | 0.0 | 0.0 |
For data sources see[5]