X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394213504000

Well Details

Well ID: 0394213504000
Loading map...
Location: 00/04-35-039-21W4/0
Location Alias: 00/04-35-39-21 W4M
Location Alias 2: 00/04-35-039-21 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 21
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: CELTIC BUFFLK 4-35-39-21
Operator Name: XTO Energy Canada ULC
License Number: 0020645
License Date: 1961-04-14
License Status: Abandoned
Spud Date: 1961-04-18
Final Drill Date: 1961-05-02
Well Total Depth: 1706.90 m
Surface Hole Latitude: 52.392255
Surface Hole Longitude: -112.928759

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-04-14 Obtained License
1961-05-02 Drill Stem Test Performed
1961-05-02 Finished Drilling
1961-05-02 Well Mode changed to Drilled and Cased
1961-05-03 Drill Stem Test Performed
1961-05-04 Production Casing Operation Performed
1961-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-05 Perforation Treatment Performed - Jet Perforation
1961-05-07 Well Began Production
1961-05-07 Well Fluid changed to Crude Oil
1961-05-07 Well Mode changed to Flowing
1968-01-15 Well Fluid changed to Crude Oil
1968-01-15 Well Mode changed to Suspended
1970-10-10 Well Fluid changed to Crude Oil
1970-10-10 Well Mode changed to Flowing
1981-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-15 Plug Back Performed
1981-09-17 Perforation Treatment Performed - Jet Perforation
1988-10-18 Well Fluid changed to Crude Oil
1988-10-18 Well Mode changed to Pumping
1994-05-09 Well Log Performed
1994-05-19 Well Log Performed
1994-05-21 Perforation Treatment Performed - Cement Squeeze
1994-05-21 Plug Back Performed
1994-05-24 Well Log Performed
1994-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1994-05-25 Perforation Treatment Performed - Jet Perforation
2003-09-24 Well Log Performed
2003-09-25 Perforation Treatment Performed - Cement Squeeze
2003-09-26 Perforation Treatment Performed - Jet Perforation
2003-09-26 Well Log Performed
2003-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-05 Perforation Treatment Performed - Cement Squeeze
2005-08-08 Perforation Treatment Performed - Jet Perforation
2005-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-02-01 Well Fluid changed to Crude Oil
2007-02-01 Well Mode changed to Suspended
2014-10-24 Perforation Treatment Performed - Jet Perforation
2014-10-24 Well Log Performed
2014-10-26 Perforation Treatment Performed - Cement Plug
2014-10-27 Perforation Treatment Performed - Cement Plug
2014-10-27 Perforation Treatment Performed - Cement Squeeze
2014-10-28 Perforation Treatment Performed - Jet Perforation
2014-10-28 Well Log Performed
2014-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-04 Perforation Treatment Performed - Cement Squeeze
2014-11-04 Plug Back Performed
2014-11-04 Well Fluid changed to Crude Oil
2014-11-04 Well Mode changed to Abandoned Zone
2014-11-05 Well Abandoned
2014-11-05 Well Fluid changed to Crude Oil
2014-11-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-05-05 Perforation 1681.60 1683.10 13
2003-09-27 Acid Treatment 1664.50 1665.70 0
2005-08-05 Cement Squeeze 1664.50 1665.70 0
2005-08-08 Perforation 1659.10 1661.00 17
2005-08-09 Acid Treatment 1659.10 1661.00 0
2014-10-24 Perforation 392.00 393.00 17
2014-10-26 Cement Plug 1231.00 1651.00 0
2014-10-26 Cement Plug 811.00 1231.00 0
2014-10-26 Cement Plug 393.00 811.00 0
2014-10-27 Cement Squeeze 392.00 393.00 0
2014-10-27 Cement Plug 386.40 393.00 0
1961-05-05 Acid Treatment 1681.60 1683.10 0
2014-10-28 Perforation 199.00 200.00 17
2014-10-28 Perforation 179.00 180.00 17
2014-10-28 Perforation 335.00 336.00 17
2014-10-28 Perforation 316.00 317.00 17
2014-10-28 Perforation 281.00 282.00 17
2014-10-28 Perforation 230.00 231.00 17
2014-10-28 Perforation 209.00 210.00 17
2014-11-04 Cement Squeeze 179.00 336.00 0
2014-11-04 Packing Device Capped w/Cement 155.00 170.00 0
1981-09-15 Packing Device Capped w/Cement 1677.90 1679.50 0
1981-09-17 Perforation 1673.40 1675.20 13
1994-05-21 Cement Squeeze 1673.40 1675.20 0
1994-05-25 Perforation 1668.40 1669.40 18
1994-05-25 Acid Wash 1668.40 1669.40 0
2003-09-25 Cement Squeeze 1668.40 1669.40 0
2003-09-26 Perforation 1664.50 1665.70 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 545 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1970 622 0.0 0.0 0.0
1971 4944 0.0 0.0 0.0
1972 5869 0.0 0.0 0.0
1973 7686 0.0 0.0 0.0
1974 7948 0.0 0.0 0.0
1975 6924 0.0 0.0 0.0
1976 6673 0.0 0.0 0.0
1977 7230 0.0 0.0 0.0
1978 6372 0.0 0.0 0.0
1979 6696 0.0 0.0 0.0
1980 5459 0.0 0.0 0.0
1981 3150 0.0 0.0 0.0
1982 7665 0.0 0.0 0.0
1983 8686 0.0 0.0 0.0
1984 8625 0.0 0.0 0.0
1985 8704 0.0 0.0 0.0
1986 8593 0.0 0.0 0.0
1987 8663 0.0 0.0 0.0
1988 8664 0.0 0.0 0.0
1989 7934 0.0 0.0 0.0
1990 8654 0.0 0.0 0.0
1991 8188 0.0 0.0 0.0
1992 8709 0.0 0.0 0.0
1993 8459 0.0 0.0 0.0
1994 8253 0.0 0.0 0.0
1995 8421 0.0 0.0 0.0
1996 8319 0.0 0.0 0.0
1997 7331 0.0 0.0 0.0
1998 8407 0.0 0.0 0.0
1999 8042 0.0 0.0 0.0
2000 8617 0.0 0.0 0.0
2001 7609 0.0 0.0 0.0
2002 8204 0.0 0.0 0.0
2003 1699 0.0 0.0 0.0
2004 7654 0.0 0.0 0.0
2005 6879 0.0 0.0 0.0
2006 8573 0.0 0.0 0.0
2007 432 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References