If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395092415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.362571,"lon":-115.158757,"icon":""}]} |
Location: 00/15-24-039-09W5/0 | |
Location Alias: 00/15-24-39-09 W5M | |
Location Alias 2: 00/15-24-039-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 09 | |
Section: 24 | |
County/Municipality: Clearwater County | |
Well Name: OUC HZ FERRIER 15-24-39-9 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0496783 | |
License Date: 2019-12-05 | |
License Status: Amended | |
Spud Date: 2020-01-15 | |
Final Drill Date: 2020-01-23 | |
Well Total Depth: 4081.00 m | |
Surface Hole Latitude: 52.362571 | |
Surface Hole Longitude: -115.158757 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-01-15 | Ensign Drilling Inc. | 225 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2020-01-18 | 688.30 | Deviate (5 - 79 degrees) |
2020-01-20 | 2479.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-02-18 | Multi-Stage Fracture | 4006.20 | 4006.30 | 0 |
2020-02-18 | Multi-Stage Fracture | 3758.80 | 3758.90 | 0 |
2020-02-18 | Multi-Stage Fracture | 3731.70 | 3731.80 | 0 |
2020-02-18 | Multi-Stage Fracture | 3704.50 | 3704.60 | 0 |
2020-02-18 | Multi-Stage Fracture | 3677.60 | 3677.70 | 0 |
2020-02-18 | Multi-Stage Fracture | 3650.90 | 3651.00 | 0 |
2020-02-18 | Multi-Stage Fracture | 3623.80 | 3623.90 | 0 |
2020-02-18 | Multi-Stage Fracture | 3596.40 | 3596.50 | 0 |
2020-02-18 | Multi-Stage Fracture | 3569.20 | 3569.30 | 0 |
2020-02-18 | Multi-Stage Fracture | 3542.10 | 3542.20 | 0 |
2020-02-18 | Multi-Stage Fracture | 3514.80 | 3514.90 | 0 |
2020-02-18 | Multi-Stage Fracture | 3978.60 | 3978.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 3487.80 | 3487.90 | 0 |
2020-02-19 | Multi-Stage Fracture | 3460.50 | 3460.60 | 0 |
2020-02-19 | Multi-Stage Fracture | 3433.60 | 3433.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 3407.00 | 3407.10 | 0 |
2020-02-19 | Multi-Stage Fracture | 3379.60 | 3379.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 3352.30 | 3352.40 | 0 |
2020-02-19 | Multi-Stage Fracture | 3322.60 | 3322.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 3295.40 | 3295.50 | 0 |
2020-02-19 | Multi-Stage Fracture | 3268.80 | 3268.90 | 0 |
2020-02-19 | Multi-Stage Fracture | 3242.10 | 3242.20 | 0 |
2020-02-18 | Multi-Stage Fracture | 3951.10 | 3951.20 | 0 |
2020-02-19 | Multi-Stage Fracture | 3215.50 | 3215.60 | 0 |
2020-02-19 | Multi-Stage Fracture | 3188.30 | 3188.40 | 0 |
2020-02-19 | Multi-Stage Fracture | 3160.70 | 3160.80 | 0 |
2020-02-19 | Multi-Stage Fracture | 3133.50 | 3133.60 | 0 |
2020-02-19 | Multi-Stage Fracture | 3106.20 | 3106.30 | 0 |
2020-02-19 | Multi-Stage Fracture | 3078.90 | 3079.00 | 0 |
2020-02-19 | Multi-Stage Fracture | 3051.60 | 3051.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 3024.20 | 3024.30 | 0 |
2020-02-19 | Multi-Stage Fracture | 2997.00 | 2997.10 | 0 |
2020-02-19 | Multi-Stage Fracture | 2970.00 | 2970.10 | 0 |
2020-02-18 | Multi-Stage Fracture | 3921.20 | 3921.30 | 0 |
2020-02-19 | Multi-Stage Fracture | 2942.30 | 2942.40 | 0 |
2020-02-19 | Multi-Stage Fracture | 2915.90 | 2916.00 | 0 |
2020-02-19 | Multi-Stage Fracture | 2888.40 | 2888.50 | 0 |
2020-02-19 | Multi-Stage Fracture | 2860.90 | 2861.00 | 0 |
2020-02-19 | Multi-Stage Fracture | 2833.60 | 2833.70 | 0 |
2020-02-19 | Multi-Stage Fracture | 2806.10 | 2806.20 | 0 |
2020-02-19 | Multi-Stage Fracture | 2778.80 | 2778.90 | 0 |
2020-02-19 | Multi-Stage Fracture | 2752.50 | 2752.60 | 0 |
2020-02-19 | Multi-Stage Fracture | 2725.10 | 2725.20 | 0 |
2020-02-19 | Multi-Stage Fracture | 2698.10 | 2698.20 | 0 |
2020-02-18 | Multi-Stage Fracture | 3893.70 | 3893.80 | 0 |
2020-02-19 | Multi-Stage Fracture | 2671.10 | 2671.20 | 0 |
2020-02-19 | Multi-Stage Fracture | 2644.00 | 2644.10 | 0 |
2020-02-18 | Multi-Stage Fracture | 3867.30 | 3867.40 | 0 |
2020-02-18 | Multi-Stage Fracture | 3839.90 | 3840.00 | 0 |
2020-02-18 | Multi-Stage Fracture | 3812.70 | 3812.80 | 0 |
2020-02-18 | Multi-Stage Fracture | 3785.50 | 3785.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 1101 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-01-25 | No Incident Encountered | 0.00 | 0.00 |
2020-03-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]