If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013403002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.47878,"lon":-110.066878,"icon":""}]} |
Location: 00/03-34-040-01W4/2 | |
Location Alias: 00/03-34-40-01 W4M | |
Location Alias 2: 00/03-34-040-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 34 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: HARVEST ET AL RE 3A HAYTER 3-34-40-1 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0088047 | |
License Date: 1981-01-06 | |
License Status: Suspension | |
Spud Date: 2005-09-25 | |
Final Drill Date: 2005-09-26 | |
Well Total Depth: 888.70 m | |
Surface Hole Latitude: 52.478780 | |
Surface Hole Longitude: -110.066878 |
Date | Event |
---|---|
1981-01-06 | Obtained License |
2005-09-26 | Finished Drilling |
2005-09-26 | Well Log Performed |
2005-09-26 | Well Mode changed to Drilled and Cased |
2005-09-27 | Perforation Treatment Performed - Jet Perforation |
2005-09-27 | Perforation Treatment Performed - Open-Hole Completion |
2005-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-09-30 | Rig Released |
2006-08-01 | Well Began Injection |
2006-08-01 | Well Fluid changed to Water |
2006-08-01 | Well Type changed to Injection |
2007-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-06-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-05-01 | Well Fluid changed to Water |
2011-05-01 | Well Type changed to Disposal |
2012-03-01 | Perforation Treatment Performed - Chemical Squeeze |
2016-10-24 | Perforation Treatment Performed - Jet Perforation |
2016-10-25 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-27 | Open Hole/Barefoot Completion | 842.00 | 888.70 | 0 |
2005-09-27 | Perforation | 832.00 | 841.00 | 17 |
2005-09-29 | Acid Treatment | 832.00 | 888.70 | 0 |
2007-02-09 | Acid Treatment | 832.00 | 867.00 | 0 |
2008-06-27 | Acid Treatment | 832.00 | 888.70 | 0 |
2012-03-01 | Chemical Squeeze | 832.00 | 888.70 | 0 |
2016-10-24 | Perforation | 763.60 | 766.80 | 1 |
2016-10-25 | Remedial Casing Cementing | 763.60 | 766.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-10-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]