If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404131808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.436042,"lon":-111.879688,"icon":""}]} |
Location: 00/08-18-040-13W4/0 | |
Location Alias: 00/08-18-40-13 W4M | |
Location Alias 2: 00/08-18-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 18 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: PRED HZ HALKIRKE 8-18-40-13 | |
Operator Name: Pismo Energy Ltd. | |
License Number: 0435710 | |
License Date: 2011-08-04 | |
License Status: Issued | |
Spud Date: 2011-08-17 | |
Final Drill Date: 2011-08-24 | |
Well Total Depth: 2452.00 m | |
Surface Hole Latitude: 52.436042 | |
Surface Hole Longitude: -111.879688 |
Date | Event |
---|---|
2011-08-04 | Obtained License |
2011-08-17 | Direction Drilling Operation Performed - Horizontal |
2011-08-17 | Surface Casing Operation Performed |
2011-08-17 | Well Log Performed |
2011-08-20 | Intermediate Casing Operation Performed |
2011-08-24 | Finished Drilling |
2011-08-24 | Well Log Performed |
2011-08-24 | Well Mode changed to Drilled and Cased |
2011-08-28 | Production Casing Operation Performed |
2011-08-28 | Rig Released |
2011-09-07 | Perforation Treatment Performed - Jet Perforation |
2011-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-23 | Well Began Production |
2011-09-23 | Well Fluid changed to Crude Oil |
2011-09-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-17 | 484.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-07 | Perforation | 2188.00 | 2188.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1968.00 | 1968.10 | 0 |
2011-09-07 | Perforation | 1895.00 | 1895.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1895.00 | 1895.10 | 0 |
2011-09-07 | Perforation | 1845.00 | 1845.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1845.00 | 1845.10 | 0 |
2011-09-07 | Perforation | 1790.00 | 1790.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1790.00 | 1790.10 | 0 |
2011-09-07 | Perforation | 1729.00 | 1729.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1729.00 | 1729.10 | 0 |
2011-09-07 | Perforation | 1604.00 | 1604.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 2188.00 | 2188.10 | 0 |
2011-09-07 | Multi-Stage Fracture | 1604.00 | 1604.10 | 0 |
2011-09-07 | Perforation | 1540.00 | 1540.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1540.00 | 1540.10 | 0 |
2011-09-07 | Perforation | 1440.00 | 1440.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1440.00 | 1440.10 | 0 |
2011-09-07 | Perforation | 1372.00 | 1372.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1372.00 | 1372.10 | 0 |
2011-09-07 | Perforation | 1240.00 | 1240.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1240.00 | 1240.10 | 0 |
2011-09-07 | Perforation | 1192.00 | 1192.10 | 1 |
2011-09-07 | Perforation | 2150.00 | 2150.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1192.00 | 1192.10 | 0 |
2011-09-07 | Perforation | 1147.00 | 1147.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 1147.00 | 1147.10 | 0 |
2011-09-07 | Multi-Stage Fracture | 2150.00 | 2150.10 | 0 |
2011-09-07 | Perforation | 2108.00 | 2108.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 2108.00 | 2108.10 | 0 |
2011-09-07 | Perforation | 2028.00 | 2028.10 | 1 |
2011-09-07 | Multi-Stage Fracture | 2028.00 | 2028.10 | 0 |
2011-09-07 | Perforation | 1968.00 | 1968.10 | 1 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2339 | 0.0 | 0.0 | 0.0 |
2012 | 8371 | 0.0 | 0.0 | 0.0 |
2013 | 6669 | 0.0 | 0.0 | 0.0 |
2014 | 6218 | 0.0 | 0.0 | 0.0 |
2015 | 5426 | 0.0 | 0.0 | 0.0 |
2017 | 5256 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 7080 | 0.0 | 0.0 | 0.0 |
2020 | 1655 | 0.0 | 0.0 | 0.0 |
For data sources see[6]