X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131808000

Well Details

Well ID: 0404131808000
Loading map...
Location: 00/08-18-040-13W4/0
Location Alias: 00/08-18-40-13 W4M
Location Alias 2: 00/08-18-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 18
County/Municipality: County of Paintearth No. 18
Well Name: PRED HZ HALKIRKE 8-18-40-13
Operator Name: Pismo Energy Ltd.
License Number: 0435710
License Date: 2011-08-04
License Status: Issued
Spud Date: 2011-08-17
Final Drill Date: 2011-08-24
Well Total Depth: 2452.00 m
Surface Hole Latitude: 52.436042
Surface Hole Longitude: -111.879688

For data sources see[1][2]

Well History

Date Event
2011-08-04 Obtained License
2011-08-17 Direction Drilling Operation Performed - Horizontal
2011-08-17 Surface Casing Operation Performed
2011-08-17 Well Log Performed
2011-08-20 Intermediate Casing Operation Performed
2011-08-24 Finished Drilling
2011-08-24 Well Log Performed
2011-08-24 Well Mode changed to Drilled and Cased
2011-08-28 Production Casing Operation Performed
2011-08-28 Rig Released
2011-09-07 Perforation Treatment Performed - Jet Perforation
2011-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-23 Well Began Production
2011-09-23 Well Fluid changed to Crude Oil
2011-09-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-17 484.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-07 Perforation 2188.00 2188.10 1
2011-09-07 Multi-Stage Fracture 1968.00 1968.10 0
2011-09-07 Perforation 1895.00 1895.10 1
2011-09-07 Multi-Stage Fracture 1895.00 1895.10 0
2011-09-07 Perforation 1845.00 1845.10 1
2011-09-07 Multi-Stage Fracture 1845.00 1845.10 0
2011-09-07 Perforation 1790.00 1790.10 1
2011-09-07 Multi-Stage Fracture 1790.00 1790.10 0
2011-09-07 Perforation 1729.00 1729.10 1
2011-09-07 Multi-Stage Fracture 1729.00 1729.10 0
2011-09-07 Perforation 1604.00 1604.10 1
2011-09-07 Multi-Stage Fracture 2188.00 2188.10 0
2011-09-07 Multi-Stage Fracture 1604.00 1604.10 0
2011-09-07 Perforation 1540.00 1540.10 1
2011-09-07 Multi-Stage Fracture 1540.00 1540.10 0
2011-09-07 Perforation 1440.00 1440.10 1
2011-09-07 Multi-Stage Fracture 1440.00 1440.10 0
2011-09-07 Perforation 1372.00 1372.10 1
2011-09-07 Multi-Stage Fracture 1372.00 1372.10 0
2011-09-07 Perforation 1240.00 1240.10 1
2011-09-07 Multi-Stage Fracture 1240.00 1240.10 0
2011-09-07 Perforation 1192.00 1192.10 1
2011-09-07 Perforation 2150.00 2150.10 1
2011-09-07 Multi-Stage Fracture 1192.00 1192.10 0
2011-09-07 Perforation 1147.00 1147.10 1
2011-09-07 Multi-Stage Fracture 1147.00 1147.10 0
2011-09-07 Multi-Stage Fracture 2150.00 2150.10 0
2011-09-07 Perforation 2108.00 2108.10 1
2011-09-07 Multi-Stage Fracture 2108.00 2108.10 0
2011-09-07 Perforation 2028.00 2028.10 1
2011-09-07 Multi-Stage Fracture 2028.00 2028.10 0
2011-09-07 Perforation 1968.00 1968.10 1

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2339 0.0 0.0 0.0
2012 8371 0.0 0.0 0.0
2013 6669 0.0 0.0 0.0
2014 6218 0.0 0.0 0.0
2015 5426 0.0 0.0 0.0
2017 5256 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 7080 0.0 0.0 0.0
2020 1655 0.0 0.0 0.0

For data sources see[6]

References