X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141510000

Well Details

Well ID: 0404141510000
Loading map...
Location: 00/10-15-040-14W4/0
Location Alias: 00/10-15-40-14 W4M
Location Alias 2: 00/10-15-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 15
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 10-15-40-14
Operator Name: Karve Energy Inc.
License Number: 0439987
License Date: 2011-12-01
License Status: Issued
Spud Date: 2012-01-19
Final Drill Date: 2012-01-24
Well Total Depth: 1738.00 m
Surface Hole Latitude: 52.443644
Surface Hole Longitude: -111.920827

For data sources see[1][2]

Well History

Date Event
2011-12-01 Obtained License
2012-01-20 Surface Casing Operation Performed
2012-01-21 Direction Drilling Operation Performed - Horizontal
2012-01-22 Intermediate Casing Operation Performed
2012-01-22 Well Log Performed
2012-01-24 Finished Drilling
2012-01-24 Well Log Performed
2012-01-24 Well Mode changed to Drilled and Cased
2012-01-25 Liner Casing Operation Performed
2012-01-25 Perforation Treatment Performed - Open-Hole Completion
2012-01-25 Rig Released
2012-01-26 Well Log Performed
2012-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping
2012-02-24 Well Log Performed
2014-09-01 Well Fluid changed to Crude Oil
2014-09-01 Well Mode changed to Suspended
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-19 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-21 475.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-25 Open Hole/Barefoot Completion 1715.00 1738.00 0
2012-01-30 Multi-Stage Fracture 1400.00 1400.10 0
2012-01-30 Multi-Stage Fracture 1362.00 1362.10 0
2012-01-30 Multi-Stage Fracture 1323.00 1323.10 0
2012-01-30 Multi-Stage Fracture 1285.00 1285.10 0
2012-01-30 Multi-Stage Fracture 1214.00 1214.10 0
2012-01-30 Multi-Stage Fracture 1175.00 1175.10 0
2012-01-30 Multi-Stage Fracture 1699.00 1699.10 0
2012-01-30 Multi-Stage Fracture 1671.00 1671.10 0
2012-01-30 Multi-Stage Fracture 1632.00 1632.10 0
2012-01-30 Multi-Stage Fracture 1594.00 1594.10 0
2012-01-30 Multi-Stage Fracture 1555.00 1555.10 0
2012-01-30 Multi-Stage Fracture 1505.00 1505.10 0
2012-01-30 Multi-Stage Fracture 1478.00 1478.10 0
2012-01-30 Multi-Stage Fracture 1428.00 1428.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3678 0.0 0.0 0.0
2014 229 0.0 0.0 0.0
2015 8413 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 8670 0.0 0.0 0.0
2018 8625 0.0 0.0 0.0
2019 8375 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[7]

References