X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243305022

Well Details

Well ID: 0404243305022
Loading map...
Location: 02/05-33-040-24W4/2
Location Alias: 02/05-33-40-24 W4M
Location Alias 2: 02/05-33-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 33
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 5-33-40-24
Operator Name: Enhance Energy Inc.
License Number: 0186432
License Date: 1996-03-01
License Status: Issued
Spud Date: 1996-03-26
Final Drill Date: 1996-04-03
Well Total Depth: 1885.00 m
Surface Hole Latitude: 52.484078
Surface Hole Longitude: -113.407784

For data sources see[1][2]

Well History

Date Event
1996-03-01 Obtained License
1996-03-28 Surface Casing Operation Performed
1996-04-03 Finished Drilling
1996-04-03 Well Mode changed to Drilled and Cased
1996-04-04 Well Log Performed
1996-04-05 Well Log Performed
1996-04-06 Production Casing Operation Performed
1996-04-07 Rig Released
1996-04-23 Well Log Performed
1996-04-24 Well Log Performed
1996-04-25 Perforation Treatment Performed - Jet Perforation
1996-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-29 Well Log Performed
1996-04-30 Perforation Treatment Performed - Jet Perforation
1996-05-01 Well Began Production
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Pumping
1996-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-19 Perforation Treatment Performed - Chemical Squeeze
2001-02-17 Well Log Performed
2001-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-19 Perforation Treatment Performed - Cement Squeeze
2001-02-19 Plug Back Performed
2001-02-19 Well Fluid changed to Crude Oil
2001-02-19 Well Mode changed to Pumping
2001-02-20 Well Log Performed
2001-02-21 Perforation Treatment Performed - Jet Perforation
2001-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-25 Perforation 1850.00 1851.50 13
2001-02-22 Acid Treatment 1815.00 1820.00 0
1996-04-26 Acid Treatment 1850.00 1851.50 0
1996-04-27 Acid Treatment 1850.00 1851.50 0
1996-04-30 Perforation 1818.00 1820.00 13
1996-05-02 Acid Treatment 1818.00 1820.00 0
1997-09-19 Chemical Squeeze 1850.00 1851.50 0
2001-02-19 Cement Squeeze 1850.00 1851.50 0
2001-02-19 Packing Device Capped w/Cement 1837.50 1846.00 0
2001-02-21 Perforation 1815.00 1817.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 4953 0.0 0.0 0.0
1997 8395 0.0 0.0 0.0
1998 8611 0.0 0.0 0.0
1999 8408 0.0 0.0 0.0
2000 6204 0.0 0.0 0.0
2001 7009 0.0 0.0 0.0
2002 8191 0.0 0.0 0.0
2003 8471 0.0 0.0 0.0
2004 8706 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8663 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 8363 0.0 0.0 0.0
2009 8749 0.0 0.0 0.0
2010 8514 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 7710 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8395 0.0 0.0 0.0
2015 8708 0.0 0.0 0.0
2016 8777 0.0 0.0 0.0
2017 8695 0.0 0.0 0.0
2018 8129 0.0 0.0 0.0
2019 4828 0.0 0.0 0.0

For data sources see[5]

References