X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414222712020

Well Details

Well ID: 0414222712020
Loading map...
Location: 02/12-27-041-22W4/0
Location Alias: 02/12-27-41-22 W4M
Location Alias 2: 02/12-27-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 27
County/Municipality: Lacombe County
Well Name: DEKALB ET AL BASHAW 12-27-41-22
Operator Name: Dekalb Petroleum Corporation
License Number: 0092763
License Date: 1981-10-16
License Status: RecCertified
Spud Date: 1981-11-04
Final Drill Date: 1981-11-06
Well Total Depth: 767.00 m
Surface Hole Latitude: 52.558614
Surface Hole Longitude: -113.094670

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-16 Obtained License
1981-11-06 Finished Drilling
1981-11-06 Well Mode changed to Drilled and Cased
1981-11-07 Production Casing Operation Performed
1981-12-01 Perforation Treatment Performed - Jet Perforation
1982-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-09 Perforation Treatment Performed - Jet Perforation
1982-01-15 Perforation Treatment Performed - Fractured
1983-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-01-08 Perforation Treatment Performed - Jet Perforation
1983-03-03 Perforation Treatment Performed - Jet Perforation
1983-03-08 Perforation Treatment Performed - Fractured
1983-07-26 Well Began Production
1983-07-26 Well Fluid changed to Gas
1983-07-26 Well Mode changed to Flowing
1984-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-29 Plug Back Performed
1984-02-29 Well Fluid changed to Gas
1984-02-29 Well Mode changed to Abandoned
1984-03-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-01 Perforation 698.00 699.00 13
1983-03-08 Fracture 478.50 570.00 0
1984-02-29 Packing Device Capped w/Cement 457.00 465.00 0
1982-01-08 Packing Device Capped w/Cement 678.00 682.00 0
1982-01-09 Perforation 665.50 668.50 7
1982-01-15 Fracture 665.50 668.50 0
1983-01-08 Packing Device Capped w/Cement 638.00 646.00 0
1983-01-08 Perforation 569.00 570.00 7
1983-01-08 Perforation 530.00 533.00 7
1983-03-03 Perforation 481.50 483.50 7
1983-03-03 Perforation 478.50 479.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 21 0.0 0.0 0.0

For data sources see[5]

References