X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415042706000

Well Details

Well ID: 0415042706000
Loading map...
Location: 00/06-27-041-04W5/0
Location Alias: 00/06-27-41-04 W5M
Location Alias 2: 00/06-27-041-04 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 04
Section: 27
County/Municipality: Clearwater County
Well Name: Canlin GILBY 6-27-41-4
Operator Name: Canlin Energy Corporation
License Number: 0022080
License Date: 1962-02-08
License Status: Abandoned
Spud Date: 1962-02-16
Final Drill Date: 1962-03-05
Well Total Depth: 2212.50 m
Surface Hole Latitude: 52.557739
Surface Hole Longitude: -114.496027

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-08 Obtained License
1962-03-05 Finished Drilling
1962-03-06 Drill Stem Test Performed
1962-03-07 Production Casing Operation Performed
1962-06-25 Perforation Treatment Performed - Fractured
1962-06-25 Perforation Treatment Performed - Jet Perforation
1962-06-30 Well Mode changed to Drilled and Cased
1976-09-03 Well Began Production
1976-09-03 Well Fluid changed to Gas
1976-09-03 Well Mode changed to Flowing
1976-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Suspended
1996-01-04 Well Fluid changed to Gas
1996-01-04 Well Mode changed to Suspended
2003-11-08 Well Log Performed
2003-11-09 Well Log Performed
2003-11-10 Perforation Treatment Performed - Cement Squeeze
2003-11-10 Plug Back Performed
2003-11-10 Well Fluid changed to Gas
2003-11-10 Well Mode changed to Abandoned Zone
2003-11-12 Perforation Treatment Performed - Cement Plug
2003-11-14 Well Log Performed
2003-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-15 Perforation Treatment Performed - Jet Perforation
2003-11-16 Perforation Treatment Performed - Cement Plug
2003-11-16 Perforation Treatment Performed - Remedial Casing
2003-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-17 Perforation Treatment Performed - Jet Perforation
2003-11-17 Perforation Treatment Performed - Remedial Casing
2003-11-17 Well Log Performed
2003-11-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-25 Perforation 2190.30 2190.90 13
2003-11-15 Perforation 1323.00 1324.00 13
2003-11-15 Packing Device Capped w/Cement 1308.70 1321.00 0
2003-11-16 Remedial Casing Cementing 1037.00 1038.00 0
2003-11-16 Cement Plug 818.00 1037.00 0
2003-11-17 Perforation 435.00 436.00 13
2003-11-17 Remedial Casing Cementing 435.00 436.00 0
2003-11-17 Packing Device Capped w/Cement 412.30 420.30 0
1962-06-25 Perforation 2192.70 2193.30 13
1962-06-25 Perforation 2195.80 2196.40 13
1962-06-25 Perforation 2194.00 2194.60 13
1962-06-25 Fracture 2190.30 2196.40 0
1976-09-21 Acid Treatment 2190.30 2196.40 0
2003-11-10 Cement Squeeze 2190.30 2196.40 0
2003-11-12 Cement Plug 1817.00 2150.00 0
2003-11-15 Perforation 1037.00 1038.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 88 0.0 0.0 0.0

For data sources see[5]

References