If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415081612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.532303,"lon":-115.102491,"icon":""}]} |
Location: 00/12-16-041-08W5/0 | |
Location Alias: 00/12-16-41-08 W5M | |
Location Alias 2: 00/12-16-041-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 08 | |
Section: 16 | |
County/Municipality: Clearwater County | |
Well Name: Canlin FERRIER 12-16-41-8 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0030193 | |
License Date: 1966-03-08 | |
License Status: Abandoned | |
Spud Date: 1966-03-09 | |
Final Drill Date: 1966-03-28 | |
Well Total Depth: 2101.00 m | |
Surface Hole Latitude: 52.532303 | |
Surface Hole Longitude: -115.102491 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-03-08 | Obtained License |
1966-03-28 | Drill Stem Test Performed |
1966-03-28 | Finished Drilling |
1966-03-29 | Drill Stem Test Performed |
1966-04-01 | Production Casing Operation Performed |
1966-12-20 | Well Mode changed to Drilled and Cased |
1968-10-25 | Perforation Treatment Performed - Jet Perforation |
1968-10-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-10-26 | Perforation Treatment Performed - Fractured |
1970-02-09 | Well Began Production |
1970-02-09 | Well Fluid changed to Gas |
1970-02-09 | Well Mode changed to Flowing |
1984-09-04 | Perforation Treatment Performed - Jet Perforation |
1984-09-04 | Well Log Performed |
1984-09-06 | Perforation Treatment Performed - Fractured |
2002-02-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-05 | Perforation Treatment Performed - Jet Perforation |
2002-02-05 | Plug Back Performed |
2002-02-05 | Well Fluid changed to Gas |
2002-02-05 | Well Log Performed |
2002-02-05 | Well Mode changed to Abandoned Zone |
2002-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-06 | Perforation Treatment Performed - Remedial Casing |
2002-02-08 | Well Log Performed |
2002-02-11 | Perforation Treatment Performed - Jet Perforation |
2002-02-11 | Well Log Performed |
2002-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-12 | Perforation Treatment Performed - Remedial Casing |
2002-02-19 | Well Abandoned |
2002-02-19 | Well Fluid changed to Gas |
2002-02-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-10-25 | Perforation | 2065.30 | 2069.00 | 7 |
2002-02-06 | Remedial Casing Cementing | 530.00 | 531.00 | 0 |
2002-02-06 | Packing Device Capped w/Cement | 511.10 | 519.10 | 0 |
2002-02-11 | Perforation | 249.00 | 250.00 | 13 |
2002-02-12 | Remedial Casing Cementing | 249.00 | 250.00 | 0 |
2002-02-12 | Packing Device Capped w/Cement | 229.00 | 237.00 | 0 |
1968-10-25 | Perforation | 2073.90 | 2078.10 | 7 |
1968-10-26 | Acid Treatment | 2065.30 | 2078.10 | 0 |
1968-10-26 | Fracture | 2065.30 | 2078.10 | 0 |
1984-09-04 | Perforation | 2072.30 | 2078.70 | 13 |
1984-09-04 | Perforation | 2065.30 | 2072.30 | 13 |
1984-09-06 | Fracture | 2065.30 | 2078.70 | 0 |
2002-02-05 | Packing Device Capped w/Cement | 2047.00 | 2055.00 | 0 |
2002-02-05 | Perforation | 530.00 | 531.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 7175 | 0.0 | 0.0 | 0.0 |
1971 | 8559 | 0.0 | 0.0 | 0.0 |
1972 | 8553 | 0.0 | 0.0 | 0.0 |
1973 | 7744 | 0.0 | 0.0 | 0.0 |
1974 | 8055 | 0.0 | 0.0 | 0.0 |
1975 | 8501 | 0.0 | 0.0 | 0.0 |
1976 | 6034 | 0.0 | 0.0 | 0.0 |
1977 | 6134 | 0.0 | 0.0 | 0.0 |
1978 | 4319 | 0.0 | 0.0 | 0.0 |
1979 | 6146 | 0.0 | 0.0 | 0.0 |
1980 | 6172 | 0.0 | 0.0 | 0.0 |
1981 | 7151 | 0.0 | 0.0 | 0.0 |
1982 | 1358 | 0.0 | 0.0 | 0.0 |
1983 | 38 | 0.0 | 0.0 | 0.0 |
1986 | 813 | 0.0 | 0.0 | 0.0 |
1988 | 6743 | 0.0 | 0.0 | 0.0 |
1989 | 8704 | 0.0 | 0.0 | 0.0 |
1990 | 7314 | 0.0 | 0.0 | 0.0 |
1991 | 8280 | 0.0 | 0.0 | 0.0 |
1992 | 8310 | 0.0 | 0.0 | 0.0 |
1993 | 3663 | 0.0 | 0.0 | 0.0 |
For data sources see[5]