X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415081612000

Well Details

Well ID: 0415081612000
Loading map...
Location: 00/12-16-041-08W5/0
Location Alias: 00/12-16-41-08 W5M
Location Alias 2: 00/12-16-041-08 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 08
Section: 16
County/Municipality: Clearwater County
Well Name: Canlin FERRIER 12-16-41-8
Operator Name: Canlin Energy Corporation
License Number: 0030193
License Date: 1966-03-08
License Status: Abandoned
Spud Date: 1966-03-09
Final Drill Date: 1966-03-28
Well Total Depth: 2101.00 m
Surface Hole Latitude: 52.532303
Surface Hole Longitude: -115.102491

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-08 Obtained License
1966-03-28 Drill Stem Test Performed
1966-03-28 Finished Drilling
1966-03-29 Drill Stem Test Performed
1966-04-01 Production Casing Operation Performed
1966-12-20 Well Mode changed to Drilled and Cased
1968-10-25 Perforation Treatment Performed - Jet Perforation
1968-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-26 Perforation Treatment Performed - Fractured
1970-02-09 Well Began Production
1970-02-09 Well Fluid changed to Gas
1970-02-09 Well Mode changed to Flowing
1984-09-04 Perforation Treatment Performed - Jet Perforation
1984-09-04 Well Log Performed
1984-09-06 Perforation Treatment Performed - Fractured
2002-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-05 Perforation Treatment Performed - Jet Perforation
2002-02-05 Plug Back Performed
2002-02-05 Well Fluid changed to Gas
2002-02-05 Well Log Performed
2002-02-05 Well Mode changed to Abandoned Zone
2002-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-06 Perforation Treatment Performed - Remedial Casing
2002-02-08 Well Log Performed
2002-02-11 Perforation Treatment Performed - Jet Perforation
2002-02-11 Well Log Performed
2002-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-12 Perforation Treatment Performed - Remedial Casing
2002-02-19 Well Abandoned
2002-02-19 Well Fluid changed to Gas
2002-02-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-25 Perforation 2065.30 2069.00 7
2002-02-06 Remedial Casing Cementing 530.00 531.00 0
2002-02-06 Packing Device Capped w/Cement 511.10 519.10 0
2002-02-11 Perforation 249.00 250.00 13
2002-02-12 Remedial Casing Cementing 249.00 250.00 0
2002-02-12 Packing Device Capped w/Cement 229.00 237.00 0
1968-10-25 Perforation 2073.90 2078.10 7
1968-10-26 Acid Treatment 2065.30 2078.10 0
1968-10-26 Fracture 2065.30 2078.10 0
1984-09-04 Perforation 2072.30 2078.70 13
1984-09-04 Perforation 2065.30 2072.30 13
1984-09-06 Fracture 2065.30 2078.70 0
2002-02-05 Packing Device Capped w/Cement 2047.00 2055.00 0
2002-02-05 Perforation 530.00 531.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1970 7175 0.0 0.0 0.0
1971 8559 0.0 0.0 0.0
1972 8553 0.0 0.0 0.0
1973 7744 0.0 0.0 0.0
1974 8055 0.0 0.0 0.0
1975 8501 0.0 0.0 0.0
1976 6034 0.0 0.0 0.0
1977 6134 0.0 0.0 0.0
1978 4319 0.0 0.0 0.0
1979 6146 0.0 0.0 0.0
1980 6172 0.0 0.0 0.0
1981 7151 0.0 0.0 0.0
1982 1358 0.0 0.0 0.0
1983 38 0.0 0.0 0.0
1986 813 0.0 0.0 0.0
1988 6743 0.0 0.0 0.0
1989 8704 0.0 0.0 0.0
1990 7314 0.0 0.0 0.0
1991 8280 0.0 0.0 0.0
1992 8310 0.0 0.0 0.0
1993 3663 0.0 0.0 0.0

For data sources see[5]

References