X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424112801000

Well Details

Well ID: 0424112801000
Loading map...
Location: 00/01-28-042-11W4/0
Location Alias: 00/01-28-42-11 W4M
Location Alias 2: 00/01-28-042-11 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 11
Section: 28
County/Municipality: Flagstaff County
Well Name: FORGE PETE KILLAM 1-28-42-11
Operator Name: Gear Energy Ltd.
License Number: 0455199
License Date: 2013-02-19
License Status: Issued
Spud Date: 2013-10-14
Final Drill Date: 2013-10-21
Well Total Depth: 2051.00 m
Surface Hole Latitude: 52.639035
Surface Hole Longitude: -111.537761

For data sources see[1][2]

Well History

Date Event
2013-02-19 Obtained License
2013-10-15 Surface Casing Operation Performed
2013-10-16 Direction Drilling Operation Performed - Deviate
2013-10-16 Direction Drilling Operation Performed - Horizontal
2013-10-17 Production Casing Operation Performed
2013-10-21 Finished Drilling
2013-10-21 Well Mode changed to Drilled and Cased
2013-10-22 Liner Casing Operation Performed
2013-10-22 Rig Released
2013-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-23 Well Began Production
2013-11-23 Well Fluid changed to Crude Oil
2013-11-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-10-14 Chinook Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-10-16 630.00 Deviate (5 - 79 degrees)
2013-10-16 942.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-31 Multi-Stage Fracture 2032.60 2032.70 0
2013-10-31 Multi-Stage Fracture 1676.00 1676.10 0
2013-10-31 Multi-Stage Fracture 1642.60 1642.70 0
2013-10-31 Multi-Stage Fracture 1584.20 1584.30 0
2013-10-31 Multi-Stage Fracture 1550.80 1550.90 0
2013-10-31 Multi-Stage Fracture 1505.70 1505.80 0
2013-10-31 Multi-Stage Fracture 1460.70 1460.80 0
2013-10-31 Multi-Stage Fracture 1413.90 1414.00 0
2013-10-31 Multi-Stage Fracture 1368.80 1368.90 0
2013-10-31 Multi-Stage Fracture 1335.40 1335.50 0
2013-10-31 Multi-Stage Fracture 1208.70 1208.80 0
2013-10-31 Multi-Stage Fracture 2001.40 2001.50 0
2013-10-31 Multi-Stage Fracture 1175.20 1175.30 0
2013-10-31 Multi-Stage Fracture 1102.90 1103.00 0
2013-10-31 Multi-Stage Fracture 1071.40 1071.50 0
2013-10-31 Multi-Stage Fracture 1040.00 1040.10 0
2013-10-31 Multi-Stage Fracture 1008.60 1008.70 0
2013-10-31 Multi-Stage Fracture 1956.40 1956.50 0
2013-10-31 Multi-Stage Fracture 1923.80 1923.90 0
2013-10-31 Multi-Stage Fracture 1878.80 1878.90 0
2013-10-31 Multi-Stage Fracture 1844.40 1844.50 0
2013-10-31 Multi-Stage Fracture 1799.30 1799.40 0
2013-10-31 Multi-Stage Fracture 1754.30 1754.40 0
2013-10-31 Multi-Stage Fracture 1721.00 1721.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-31 2013-10-31 836 759 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 74.781 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 24.1634 N/A
Crystalline silica. quartz 14808-60-7 100 24.1634 N/A
Iron Oxide 1309-37-1 100 24.1634 N/A
Titanium Oxide 13463-67-7 100 24.1635 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0102 N/A
Water 7732-18-5 100 0.0102 N/A
CAN-2300 Breaker (Enzyme HpH. 50L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.1945 N/A
Water 7732-18-5 100 0.1945 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0369 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0369 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1745 N/A
Water 7732-18-5 100 0.1745 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.1203 N/A
Monoethanolamine 141-43-5 100 0.1203 N/A
Water 7732-18-5 100 0.1203 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.4375 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0812 N/A
Methanol 67-56-1 100 0.0812 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0812 N/A
Water 7732-18-5 100 0.0812 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-29 2013-10-30 Municipal Water 933

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 856 0.0 0.0 0.0
2014 8103 0.0 0.0 0.0
2015 8451 0.0 0.0 0.0
2016 8321 0.0 0.0 0.0
2017 7134 0.0 0.0 0.0
2018 8604 0.0 0.0 0.0
2019 8394 0.0 0.0 0.0
2020 1226 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-22 No Incident Encountered 0.00 0.00
2013-11-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References