X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474173611000

Well Details

Well ID: 0474173611000
Loading map...
Location: 00/11-36-047-17W4/0
Location Alias: 00/11-36-47-17 W4M
Location Alias 2: 00/11-36-047-17 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 17
Section: 36
County/Municipality: Camrose County
Well Name: PINE CLIFF BRUCE 11-36-47-17
Operator Name: Pine Cliff Energy Ltd.
License Number: 0044396
License Date: 1972-12-04
License Status: Abandoned
Spud Date: 1972-12-19
Final Drill Date: 1972-12-30
Well Total Depth: 1039.40 m
Surface Hole Latitude: 53.098120
Surface Hole Longitude: -112.360470

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-04 Obtained License
1972-12-28 Drill Stem Test Performed
1972-12-30 Drill Stem Test Performed
1972-12-30 Finished Drilling
1972-12-30 Well Mode changed to Drilled and Cased
1972-12-31 Production Casing Operation Performed
1973-02-24 Perforation Treatment Performed - Jet Perforation
1973-07-01 Well Began Production
1973-07-01 Well Fluid changed to Gas
1973-07-01 Well Mode changed to Flowing
1974-10-31 Perforation Treatment Performed - Cement Squeeze
1974-10-31 Well Fluid changed to Gas
1974-10-31 Well Mode changed to Abandoned Zone
1974-11-01 Perforation Treatment Performed - Jet Perforation
1977-03-20 Perforation Treatment Performed - Jet Perforation
1981-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-23 Perforation Treatment Performed - Jet Perforation
1993-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-19 Plug Back Performed
1993-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-20 Plug Back Performed
1993-05-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-24 Perforation 982.10 983.30 7
1974-10-31 Cement Squeeze 982.10 983.30 0
1974-11-01 Perforation 976.00 979.60 7
1977-03-20 Perforation 809.20 811.40 7
1981-02-22 Packing Device Capped w/Cement 961.30 969.30 0
1981-02-23 Perforation 894.90 896.10 6
1993-05-19 Packing Device Capped w/Cement 876.00 884.00 0
1993-05-20 Packing Device Capped w/Cement 791.00 799.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 3249 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References