If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475070308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.023298,"lon":-114.955693,"icon":""}]} |
Location: 02/08-03-047-07W5/0 | |
Location Alias: 02/08-03-47-07 W5M | |
Location Alias 2: 02/08-03-047-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 07 | |
Section: 03 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: BONTERRA 102 HZ PEMBINA 8-3-47-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0490307 | |
License Date: 2018-08-03 | |
License Status: Amended | |
Spud Date: 2018-08-24 | |
Final Drill Date: 2018-08-30 | |
Well Total Depth: 3183.00 m | |
Surface Hole Latitude: 53.023298 | |
Surface Hole Longitude: -114.955693 |
Date | Event |
---|---|
2018-08-03 | Obtained License |
2018-08-24 | Surface Casing Operation Performed |
2018-08-26 | Direction Drilling Operation Performed - Deviate |
2018-08-27 | Direction Drilling Operation Performed - Horizontal |
2018-08-30 | Finished Drilling |
2018-08-30 | Well Log Performed |
2018-08-30 | Well Mode changed to Drilled and Cased |
2018-08-31 | Production Casing Operation Performed |
2018-09-01 | Rig Released |
2018-10-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-15 | Well Began Production |
2018-10-15 | Well Fluid changed to Crude Oil |
2018-10-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-23 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-26 | 1239.50 | Deviate (5 - 79 degrees) |
2018-08-27 | 1732.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-08 | Multi-Stage Fracture | 3142.80 | 3144.80 | 0 |
2018-10-08 | Multi-Stage Fracture | 2713.10 | 2715.00 | 0 |
2018-10-08 | Multi-Stage Fracture | 2664.50 | 2666.40 | 0 |
2018-10-08 | Multi-Stage Fracture | 2616.90 | 2618.80 | 0 |
2018-10-08 | Multi-Stage Fracture | 2568.80 | 2570.70 | 0 |
2018-10-08 | Multi-Stage Fracture | 2521.40 | 2523.30 | 0 |
2018-10-08 | Multi-Stage Fracture | 2473.90 | 2475.80 | 0 |
2018-10-08 | Multi-Stage Fracture | 2426.10 | 2428.00 | 0 |
2018-10-08 | Multi-Stage Fracture | 2378.30 | 2380.20 | 0 |
2018-10-08 | Multi-Stage Fracture | 2330.30 | 2332.30 | 0 |
2018-10-08 | Multi-Stage Fracture | 2282.10 | 2284.10 | 0 |
2018-10-08 | Multi-Stage Fracture | 3095.20 | 3097.10 | 0 |
2018-10-08 | Multi-Stage Fracture | 2234.50 | 2236.40 | 0 |
2018-10-08 | Multi-Stage Fracture | 2186.90 | 2188.80 | 0 |
2018-10-08 | Multi-Stage Fracture | 2137.80 | 2139.70 | 0 |
2018-10-08 | Multi-Stage Fracture | 2090.60 | 2092.50 | 0 |
2018-10-08 | Multi-Stage Fracture | 2042.90 | 2044.90 | 0 |
2018-10-08 | Multi-Stage Fracture | 1995.00 | 1996.90 | 0 |
2018-10-08 | Multi-Stage Fracture | 1946.70 | 1948.60 | 0 |
2018-10-08 | Multi-Stage Fracture | 1898.70 | 1900.60 | 0 |
2018-10-08 | Multi-Stage Fracture | 1851.00 | 1852.90 | 0 |
2018-10-08 | Multi-Stage Fracture | 1803.10 | 1805.00 | 0 |
2018-10-08 | Multi-Stage Fracture | 3047.60 | 3049.60 | 0 |
2018-10-08 | Multi-Stage Fracture | 1766.10 | 1768.00 | 0 |
2018-10-08 | Multi-Stage Fracture | 3000.00 | 3001.90 | 0 |
2018-10-08 | Multi-Stage Fracture | 2951.60 | 2953.50 | 0 |
2018-10-08 | Multi-Stage Fracture | 2903.80 | 2905.70 | 0 |
2018-10-08 | Multi-Stage Fracture | 2856.30 | 2858.20 | 0 |
2018-10-08 | Multi-Stage Fracture | 2808.50 | 2810.40 | 0 |
2018-10-08 | Multi-Stage Fracture | 2760.90 | 2762.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-08 | 2018-10-08 | 1,564 | 3,403 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.0852 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 11.1037 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 3.9545 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0285 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0285 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0285 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0285 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0285 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0948 | N/A | |
water | Not Available | 100 | 0.0948 | N/A | ||||
FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0594 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0594 | N/A | ||||
NMR-1 | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0438 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0438 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-06 | 2018-10-08 | Surface Water - Runoff | 3071 |
2018-10-05 | 2018-10-12 | Surface Water - Runoff | 433 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1848 | 0.0 | 0.0 | 0.0 |
2019 | 8231 | 0.0 | 0.0 | 0.0 |
2020 | 1973 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-01 | No Incident Encountered | 0.00 | 0.00 |
2018-10-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]