X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200609000

Well Details

Well ID: 0484200609000
Loading map...
Location: 00/09-06-048-20W4/0
Location Alias: 00/09-06-48-20 W4M
Location Alias 2: 00/09-06-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 06
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM 9-6-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0004830
License Date: 1952-06-11
License Status: RecCertified
Spud Date: 1952-07-02
Final Drill Date: 1952-07-10
Well Total Depth: 993.00 m
Surface Hole Latitude: 53.114260
Surface Hole Longitude: -112.906927

For data sources see[1][2]

Well History

Date Event
1952-06-11 Obtained License
1952-07-07 Drill Stem Test Performed
1952-07-10 Finished Drilling
1952-07-10 Well Mode changed to Drilled and Cased
1952-07-11 Rig Released
1952-08-09 Perforation Treatment Performed - Bullet Perforation
1957-02-11 Production Casing Operation Performed
1966-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-06 Perforation Treatment Performed - Cement Squeeze
1966-10-06 Perforation Treatment Performed - Jet Perforation
1977-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-01 Well Began Production
1984-01-01 Well Fluid changed to Crude Oil
1984-01-01 Well Mode changed to Pumping
1991-07-01 Well Fluid changed to Crude Oil
1991-07-01 Well Mode changed to Suspended
1992-02-22 Well Fluid changed to Crude Oil
1992-02-22 Well Mode changed to Pumping
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Flowing
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
2000-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-15 Plug Back Performed
2000-02-16 Perforation Treatment Performed - Jet Perforation
2000-02-17 Perforation Treatment Performed - Remedial Casing
2000-02-20 Well Abandoned
2000-02-20 Well Fluid changed to Crude Oil
2000-02-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-09 Bullet Perforation 973.50 974.10 20
1966-10-06 Acid Treatment 973.50 974.10 0
1966-10-06 Cement Squeeze 973.50 974.10 0
1966-10-06 Perforation 976.00 976.90 13
1977-01-27 Perforation 972.90 978.40 13
1977-01-27 Acid Treatment 972.90 978.40 0
2000-02-15 Packing Device Capped w/Cement 951.00 959.00 0
2000-02-16 Perforation 160.00 161.00 13
2000-02-17 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 192 0.0 0.0 0.0
1968 48 0.0 0.0 0.0
1969 96 0.0 0.0 0.0
1970 5138 0.0 0.0 0.0
1971 6888 0.0 0.0 0.0
1972 7569 0.0 0.0 0.0
1973 6508 0.0 0.0 0.0
1974 6551 0.0 0.0 0.0
1977 168 0.0 0.0 0.0
1979 1002 0.0 0.0 0.0
1984 7136 0.0 0.0 0.0
1985 5537 0.0 0.0 0.0
1986 48 0.0 0.0 0.0
1990 772 0.0 0.0 0.0
1992 6802 0.0 0.0 0.0
1993 8002 0.0 0.0 0.0
1994 5050 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References