X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200612000

Well Details

Well ID: 0484200612000
Loading map...
Location: 00/12-06-048-20W4/0
Location Alias: 00/12-06-48-20 W4M
Location Alias 2: 00/12-06-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 06
County/Municipality: Camrose County
Well Name: BIG VALLEY DINANT NO.12-6V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0004952
License Date: 1952-07-07
License Status: RecCertified
Spud Date: 1952-07-29
Final Drill Date: 1952-08-08
Well Total Depth: 998.20 m
Surface Hole Latitude: 53.114227
Surface Hole Longitude: -112.924976

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-07 Obtained License
1952-08-06 Drill Stem Test Performed
1952-08-07 Drill Stem Test Performed
1952-08-08 Finished Drilling
1952-08-08 Production Casing Operation Performed
1952-08-08 Well Mode changed to Drilled and Cased
1952-08-13 Perforation Treatment Performed - Bullet Perforation
1952-09-21 Well Began Production
1952-09-21 Well Fluid changed to Crude Oil
1952-09-21 Well Mode changed to Pumping
1978-07-06 Perforation Treatment Performed - Jet Perforation
1978-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-20 Well Began Injection
1978-08-20 Well Fluid changed to Water
1978-08-20 Well Type changed to Injection
1980-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-01 Well Fluid changed to Water
1991-07-01 Well Mode changed to Suspended
1991-07-01 Well Type changed to Injection
1992-02-16 Well Fluid changed to Water
1992-02-16 Well Type changed to Injection
1994-09-09 Well Fluid changed to Water
1994-09-09 Well Mode changed to Suspended
1994-09-09 Well Type changed to Injection
1996-06-26 Well Fluid changed to Water
1996-06-26 Well Mode changed to Closed
1996-06-26 Well Type changed to Injection
1996-07-12 Well Fluid changed to Water
1996-07-12 Well Mode changed to Suspended
1996-07-12 Well Type changed to Injection
1997-06-17 Well Fluid changed to Water
1997-06-17 Well Mode changed to Closed
1997-06-17 Well Type changed to Injection
1998-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-06 Plug Back Performed
1998-09-11 Perforation Treatment Performed - Jet Perforation
1998-09-11 Well Log Performed
1998-09-12 Perforation Treatment Performed - Remedial Casing
1998-09-19 Well Abandoned
1998-09-19 Well Fluid changed to Water
1998-09-19 Well Mode changed to Abandoned
1998-09-19 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-13 Bullet Perforation 979.30 979.90 20
1978-07-06 Perforation 979.90 985.10 13
1978-07-07 Acid Treatment 979.90 985.10 0
1980-06-05 Acid Treatment 979.30 985.10 0
1998-09-06 Packing Device Capped w/Cement 961.00 969.00 0
1998-09-11 Perforation 260.00 261.00 13
1998-09-12 Remedial Casing Cementing 260.00 261.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 384 0.0 0.0 0.0
1968 4614 0.0 0.0 0.0
1969 6767 0.0 0.0 0.0
1970 5690 0.0 0.0 0.0
1971 4416 0.0 0.0 0.0
1972 6878 0.0 0.0 0.0
1973 8492 0.0 0.0 0.0
1974 7143 0.0 0.0 0.0
1975 7199 0.0 0.0 0.0
1976 5072 0.0 0.0 0.0
1977 1858 0.0 0.0 0.0
1978 1286 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References