X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200613000

Well Details

Well ID: 0484200613000
Loading map...
Location: 00/13-06-048-20W4/0
Location Alias: 00/13-06-48-20 W4M
Location Alias 2: 00/13-06-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 06
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM IN 13-6V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005442
License Date: 1952-10-07
License Status: RecCertified
Spud Date: 1952-11-17
Final Drill Date: 1952-11-23
Well Total Depth: 1001.90 m
Surface Hole Latitude: 53.117844
Surface Hole Longitude: -112.924520

For data sources see[1][2]

Well History

Date Event
1952-10-07 Obtained License
1952-11-23 Finished Drilling
1952-11-23 Well Mode changed to Drilled and Cased
1952-11-24 Drill Stem Test Performed
1952-11-25 Production Casing Operation Performed
1952-12-17 Perforation Treatment Performed - Bullet Perforation
1953-02-05 Well Began Production
1953-02-05 Well Fluid changed to Crude Oil
1953-02-05 Well Mode changed to Pumping
1954-08-07 Perforation Treatment Performed - Jet Perforation
1958-12-23 Well Fluid changed to Crude Oil
1958-12-23 Well Mode changed to Suspended
1967-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-16 Perforation Treatment Performed - Jet Perforation
1967-10-03 Well Began Injection
1967-10-03 Well Fluid changed to Water
1967-10-03 Well Type changed to Injection
1977-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-28 Well Fluid changed to Water
1987-04-28 Well Mode changed to Suspended
1987-04-28 Well Type changed to Injection
1990-02-01 Well Fluid changed to Water
1990-02-01 Well Type changed to Injection
1996-06-26 Well Fluid changed to Water
1996-06-26 Well Mode changed to Closed
1996-06-26 Well Type changed to Injection
1996-07-12 Well Fluid changed to Water
1996-07-12 Well Type changed to Injection
1997-06-17 Well Fluid changed to Water
1997-06-17 Well Mode changed to Closed
1997-06-17 Well Type changed to Injection
2000-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-12 Plug Back Performed
2000-02-16 Perforation Treatment Performed - Jet Perforation
2000-02-17 Perforation Treatment Performed - Remedial Casing
2000-02-20 Well Abandoned
2000-02-20 Well Fluid changed to Water
2000-02-20 Well Mode changed to Abandoned
2000-02-20 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-17 Bullet Perforation 979.60 980.20 20
1954-08-07 Perforation 978.40 980.80 13
1967-08-16 Perforation 978.40 981.50 7
1967-08-16 Acid Treatment 978.40 981.50 0
1977-05-09 Acid Treatment 978.40 981.50 0
1980-04-03 Acid Treatment 978.40 981.50 0
2000-02-12 Packing Device Capped w/Cement 958.50 966.50 0
2000-02-16 Perforation 160.00 161.00 13
2000-02-17 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References