X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200701000

Well Details

Well ID: 0484200701000
Loading map...
Location: 00/01-07-048-20W4/0
Location Alias: 00/01-07-48-20 W4M
Location Alias 2: 00/01-07-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 07
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM 1-7-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005314
License Date: 1952-09-15
License Status: RecCertified
Spud Date: 1952-09-21
Final Drill Date: 1952-09-26
Well Total Depth: 991.20 m
Surface Hole Latitude: 53.121495
Surface Hole Longitude: -112.906929

For data sources see[1][2]

Well History

Date Event
1952-09-15 Obtained License
1952-09-26 Drill Stem Test Performed
1952-09-26 Finished Drilling
1952-09-26 Well Mode changed to Drilled and Cased
1952-09-27 Production Casing Operation Performed
1952-10-09 Perforation Treatment Performed - Bullet Perforation
1952-12-02 Well Began Production
1952-12-02 Well Fluid changed to Crude Oil
1952-12-02 Well Mode changed to Pumping
1973-02-01 Well Fluid changed to Crude Oil
1973-02-01 Well Mode changed to Suspended
1976-12-03 Perforation Treatment Performed - Jet Perforation
1976-12-07 Well Fluid changed to Crude Oil
1976-12-07 Well Mode changed to Pumping
1977-02-28 Well Fluid changed to Crude Oil
1977-02-28 Well Mode changed to Suspended
1978-05-08 Well Fluid changed to Crude Oil
1978-05-08 Well Mode changed to Pumping
1979-07-01 Well Fluid changed to Crude Oil
1979-07-01 Well Mode changed to Suspended
1984-01-01 Well Fluid changed to Crude Oil
1984-01-01 Well Mode changed to Pumping
1991-07-01 Well Fluid changed to Crude Oil
1991-07-01 Well Mode changed to Suspended
1992-01-24 Well Fluid changed to Crude Oil
1992-01-24 Well Mode changed to Pumping
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Pumping
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
1998-03-13 Well Log Performed
2000-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-17 Plug Back Performed
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-24 Perforation Treatment Performed - Remedial Casing
2000-02-26 Well Abandoned
2000-02-26 Well Fluid changed to Crude Oil
2000-02-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-09 Bullet Perforation 973.20 974.10 20
1976-12-03 Perforation 973.50 974.40 7
1976-12-03 Perforation 975.10 978.70 7
2000-02-17 Packing Device Capped w/Cement 942.30 950.30 0
2000-02-22 Perforation 160.00 161.00 13
2000-02-24 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 120 0.0 0.0 0.0
1968 3168 0.0 0.0 0.0
1969 4631 0.0 0.0 0.0
1970 8435 0.0 0.0 0.0
1971 6280 0.0 0.0 0.0
1972 2784 0.0 0.0 0.0
1973 384 0.0 0.0 0.0
1976 120 0.0 0.0 0.0
1978 5159 0.0 0.0 0.0
1979 973 0.0 0.0 0.0
1984 8346 0.0 0.0 0.0
1985 8467 0.0 0.0 0.0
1986 8212 0.0 0.0 0.0
1987 8167 0.0 0.0 0.0
1988 8378 0.0 0.0 0.0
1989 3762 0.0 0.0 0.0
1992 7772 0.0 0.0 0.0
1993 6962 0.0 0.0 0.0
1994 3156 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References