X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200707000

Well Details

Well ID: 0484200707000
Loading map...
Location: 00/07-07-048-20W4/0
Location Alias: 00/07-07-48-20 W4M
Location Alias 2: 00/07-07-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 07
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM 7-7-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005402
License Date: 1952-09-30
License Status: RecCertified
Spud Date: 1952-10-06
Final Drill Date: 1952-10-12
Well Total Depth: 992.10 m
Surface Hole Latitude: 53.125101
Surface Hole Longitude: -112.912943

For data sources see[1][2]

Well History

Date Event
1952-09-30 Obtained License
1952-10-12 Drill Stem Test Performed
1952-10-12 Finished Drilling
1952-10-12 Production Casing Operation Performed
1952-10-12 Well Mode changed to Drilled and Cased
1952-10-25 Perforation Treatment Performed - Bullet Perforation
1952-12-01 Well Began Production
1952-12-01 Well Fluid changed to Crude Oil
1952-12-01 Well Mode changed to Flowing
1977-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-23 Perforation Treatment Performed - Jet Perforation
1984-01-01 Well Fluid changed to Crude Oil
1984-01-01 Well Mode changed to Pumping
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Pumping
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
2000-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-19 Plug Back Performed
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-24 Perforation Treatment Performed - Remedial Casing
2000-02-26 Well Abandoned
2000-02-26 Well Fluid changed to Crude Oil
2000-02-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-25 Bullet Perforation 974.80 975.40 20
1977-11-23 Perforation 973.50 976.30 7
1977-11-23 Acid Treatment 973.50 976.30 0
2000-02-19 Packing Device Capped w/Cement 952.60 960.60 0
2000-02-22 Perforation 160.00 161.00 13
2000-02-24 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 408 0.0 0.0 0.0
1968 6599 0.0 0.0 0.0
1969 7607 0.0 0.0 0.0
1970 8519 0.0 0.0 0.0
1971 7631 0.0 0.0 0.0
1972 8077 0.0 0.0 0.0
1973 8484 0.0 0.0 0.0
1974 8519 0.0 0.0 0.0
1975 8472 0.0 0.0 0.0
1976 8104 0.0 0.0 0.0
1977 7741 0.0 0.0 0.0
1978 7958 0.0 0.0 0.0
1979 5034 0.0 0.0 0.0
1984 8453 0.0 0.0 0.0
1985 8538 0.0 0.0 0.0
1986 8095 0.0 0.0 0.0
1987 8015 0.0 0.0 0.0
1988 8484 0.0 0.0 0.0
1989 8409 0.0 0.0 0.0
1990 5476 0.0 0.0 0.0
1991 8259 0.0 0.0 0.0
1992 8361 0.0 0.0 0.0
1993 8421 0.0 0.0 0.0
1994 3652 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References