If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484200708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.125112,"lon":-112.90693,"icon":""}]} |
Location: 00/08-07-048-20W4/0 | |
Location Alias: 00/08-07-48-20 W4M | |
Location Alias 2: 00/08-07-048-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 20 | |
Section: 07 | |
County/Municipality: Camrose County | |
Well Name: BIG VALLEY JOARCAM 8-7-48-20 | |
Operator Name: Big Valley Energy Corporation | |
License Number: 0005274 | |
License Date: 1952-09-08 | |
License Status: RecCertified | |
Spud Date: 1952-09-11 | |
Final Drill Date: 1952-09-19 | |
Well Total Depth: 989.70 m | |
Surface Hole Latitude: 53.125112 | |
Surface Hole Longitude: -112.906930 |
Date | Event |
---|---|
1952-09-08 | Obtained License |
1952-09-19 | Drill Stem Test Performed |
1952-09-19 | Finished Drilling |
1952-09-19 | Production Casing Operation Performed |
1952-09-19 | Well Mode changed to Drilled and Cased |
1952-10-06 | Perforation Treatment Performed - Bullet Perforation |
1952-12-05 | Well Began Production |
1952-12-05 | Well Fluid changed to Crude Oil |
1952-12-05 | Well Mode changed to Pumping |
1959-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-06-12 | Perforation Treatment Performed - Cement Squeeze |
1959-06-19 | Perforation Treatment Performed - Jet Perforation |
1959-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-09-09 | Perforation Treatment Performed - Bullet Perforation |
1975-09-30 | Well Fluid changed to Crude Oil |
1975-09-30 | Well Mode changed to Suspended |
1977-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-01-11 | Perforation Treatment Performed - Jet Perforation |
1977-01-14 | Well Fluid changed to Crude Oil |
1977-01-14 | Well Mode changed to Pumping |
1977-02-28 | Well Fluid changed to Crude Oil |
1977-02-28 | Well Mode changed to Suspended |
1979-09-01 | Well Fluid changed to Crude Oil |
1979-09-01 | Well Mode changed to Pumping |
1984-01-01 | Well Fluid changed to Crude Oil |
1984-01-01 | Well Mode changed to Suspended |
1992-03-17 | Perforation Treatment Performed - Jet Perforation |
1992-04-20 | Well Fluid changed to Crude Oil |
1992-04-20 | Well Mode changed to Pumping |
1996-06-26 | Well Fluid changed to Crude Oil |
1996-06-26 | Well Mode changed to Closed |
1996-07-31 | Well Fluid changed to Crude Oil |
1996-07-31 | Well Mode changed to Flowing |
1997-06-17 | Well Fluid changed to Crude Oil |
1997-06-17 | Well Mode changed to Closed |
2000-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-02-20 | Plug Back Performed |
2000-02-22 | Perforation Treatment Performed - Jet Perforation |
2000-02-24 | Perforation Treatment Performed - Fractured |
2000-02-27 | Well Abandoned |
2000-02-27 | Well Fluid changed to Crude Oil |
2000-02-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-10-06 | Bullet Perforation | 972.60 | 973.50 | 20 |
1992-03-17 | Perforation | 969.80 | 971.20 | 13 |
2000-02-20 | Packing Device Capped w/Cement | 952.70 | 960.70 | 0 |
2000-02-22 | Perforation | 160.00 | 161.00 | 13 |
2000-02-24 | Fracture | 160.00 | 161.00 | 0 |
1959-06-10 | Acid Treatment | 972.60 | 973.50 | 0 |
1959-06-12 | Cement Squeeze | 972.60 | 973.50 | 0 |
1959-06-19 | Perforation | 975.70 | 976.90 | 13 |
1959-09-05 | Acid Treatment | 975.70 | 976.90 | 0 |
1959-09-09 | Bullet Perforation | 974.10 | 975.40 | 13 |
1959-09-09 | Bullet Perforation | 975.70 | 976.00 | 13 |
1977-01-11 | Perforation | 971.70 | 975.40 | 13 |
1977-01-11 | Acid Treatment | 971.70 | 975.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 1114 | 0.0 | 0.0 | 0.0 |
1968 | 4991 | 0.0 | 0.0 | 0.0 |
1969 | 1104 | 0.0 | 0.0 | 0.0 |
1970 | 7740 | 0.0 | 0.0 | 0.0 |
1971 | 7583 | 0.0 | 0.0 | 0.0 |
1972 | 8519 | 0.0 | 0.0 | 0.0 |
1973 | 8238 | 0.0 | 0.0 | 0.0 |
1974 | 7920 | 0.0 | 0.0 | 0.0 |
1975 | 5375 | 0.0 | 0.0 | 0.0 |
1977 | 282 | 0.0 | 0.0 | 0.0 |
1992 | 5206 | 0.0 | 0.0 | 0.0 |
1993 | 8020 | 0.0 | 0.0 | 0.0 |
1994 | 3166 | 0.0 | 0.0 | 0.0 |
1996 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]