X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200803000

Well Details

Well ID: 0484200803000
Loading map...
Location: 00/03-08-048-20W4/0
Location Alias: 00/03-08-48-20 W4M
Location Alias 2: 00/03-08-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 08
County/Municipality: Camrose County
Well Name: BIG VALLEY DINANT NO.3-8V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005662
License Date: 1952-11-18
License Status: RecCertified
Spud Date: 1952-11-24
Final Drill Date: 1952-12-01
Well Total Depth: 986.30 m
Surface Hole Latitude: 53.121506
Surface Hole Longitude: -112.894602

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-11-18 Obtained License
1952-12-01 Drill Stem Test Performed
1952-12-01 Finished Drilling
1952-12-01 Well Mode changed to Drilled and Cased
1952-12-02 Production Casing Operation Performed
1953-01-02 Perforation Treatment Performed - Bullet Perforation
1953-01-27 Well Began Production
1953-01-27 Well Fluid changed to Crude Oil
1953-01-27 Well Mode changed to Pumping
1953-12-22 Perforation Treatment Performed - Cement Squeeze
1954-01-05 Perforation Treatment Performed - Bullet Perforation
1960-02-18 Perforation Treatment Performed - Bullet Perforation
1960-11-23 Well Fluid changed to Crude Oil
1960-11-23 Well Mode changed to Suspended
1961-02-16 Well Fluid changed to Crude Oil
1961-02-16 Well Mode changed to Pumping
1968-10-08 Well Fluid changed to Crude Oil
1968-10-08 Well Mode changed to Suspended
1970-05-01 Well Began Injection
1970-05-01 Well Fluid changed to Water
1970-05-01 Well Type changed to Injection
1971-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-01 Well Fluid changed to Water
1983-12-01 Well Mode changed to Suspended
1983-12-01 Well Type changed to Injection
1996-06-26 Well Fluid changed to Water
1996-06-26 Well Mode changed to Closed
1996-06-26 Well Type changed to Injection
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Flowing
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
2000-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-22 Plug Back Performed
2000-02-25 Perforation Treatment Performed - Remedial Casing
2000-02-27 Well Abandoned
2000-02-27 Well Fluid changed to Crude Oil
2000-02-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-02 Bullet Perforation 968.30 969.00 20
1953-12-22 Cement Squeeze 968.30 969.00 0
1954-01-05 Bullet Perforation 970.20 971.40 13
1960-02-18 Bullet Perforation 969.30 971.10 13
1971-08-23 Acid Treatment 969.30 971.40 0
2000-02-22 Packing Device Capped w/Cement 953.00 961.00 0
2000-02-22 Perforation 160.00 161.00 13
2000-02-25 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1158 0.0 0.0 0.0
1968 561 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References