X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201803000

Well Details

Well ID: 0484201803000
Loading map...
Location: 00/03-18-048-20W4/0
Location Alias: 00/03-18-48-20 W4M
Location Alias 2: 00/03-18-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 18
County/Municipality: Camrose County
Well Name: BIG VALLEY DINANT NO. 3-18V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005484
License Date: 1952-10-11
License Status: RecCertified
Spud Date: 1952-10-19
Final Drill Date: 1952-10-24
Well Total Depth: 991.80 m
Surface Hole Latitude: 53.136109
Surface Hole Longitude: -112.918953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-11 Obtained License
1952-10-24 Drill Stem Test Performed
1952-10-24 Finished Drilling
1952-10-24 Well Mode changed to Drilled and Cased
1952-10-25 Production Casing Operation Performed
1952-12-11 Perforation Treatment Performed - Bullet Perforation
1952-12-21 Well Began Production
1952-12-21 Well Fluid changed to Crude Oil
1952-12-21 Well Mode changed to Pumping
1974-08-06 Perforation Treatment Performed - Jet Perforation
1974-08-07 Perforation Treatment Performed - Acid Wash - No Pressure
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Flowing
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
1998-03-14 Well Log Performed
2000-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-10 Perforation Treatment Performed - Jet Perforation
2000-02-10 Plug Back Performed
2000-02-10 Well Fluid changed to Crude Oil
2000-02-10 Well Log Performed
2000-02-10 Well Mode changed to Abandoned Zone
2000-02-25 Perforation Treatment Performed - Cement Plug
2000-02-25 Perforation Treatment Performed - Remedial Casing
2000-02-28 Well Abandoned
2000-02-28 Well Fluid changed to Crude Oil
2000-02-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-11 Bullet Perforation 975.40 976.00 20
1974-08-06 Perforation 973.20 976.00 7
1974-08-07 Acid Wash 973.20 976.00 0
2000-02-10 Packing Device Capped w/Cement 951.40 960.00 0
2000-02-10 Perforation 163.70 164.70 10
2000-02-25 Remedial Casing Cementing 163.70 164.70 0
2000-02-25 Cement Plug 120.00 164.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 264 0.0 0.0 0.0
1968 480 0.0 0.0 0.0
1970 528 0.0 0.0 0.0
1971 7176 0.0 0.0 0.0
1972 7984 0.0 0.0 0.0
1973 8525 0.0 0.0 0.0
1974 8136 0.0 0.0 0.0
1975 7792 0.0 0.0 0.0
1976 6550 0.0 0.0 0.0
1977 6100 0.0 0.0 0.0
1978 6308 0.0 0.0 0.0
1979 8382 0.0 0.0 0.0
1980 8611 0.0 0.0 0.0
1981 8342 0.0 0.0 0.0
1982 8544 0.0 0.0 0.0
1983 8306 0.0 0.0 0.0
1984 8414 0.0 0.0 0.0
1985 8284 0.0 0.0 0.0
1986 8388 0.0 0.0 0.0
1987 8185 0.0 0.0 0.0
1988 8365 0.0 0.0 0.0
1989 8442 0.0 0.0 0.0
1990 8063 0.0 0.0 0.0
1991 1818 0.0 0.0 0.0
1992 7531 0.0 0.0 0.0
1993 8345 0.0 0.0 0.0
1994 1931 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References