X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201806000

Well Details

Well ID: 0484201806000
Loading map...
Location: 00/06-18-048-20W4/0
Location Alias: 00/06-18-48-20 W4M
Location Alias 2: 00/06-18-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 18
County/Municipality: Camrose County
Well Name: BIG VALLEY DINANT NO.6-18V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005548
License Date: 1952-10-28
License Status: RecCertified
Spud Date: 1952-11-02
Final Drill Date: 1952-11-05
Well Total Depth: 996.40 m
Surface Hole Latitude: 53.139726
Surface Hole Longitude: -112.918952

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-28 Obtained License
1952-11-05 Drill Stem Test Performed
1952-11-05 Finished Drilling
1952-11-05 Well Mode changed to Drilled and Cased
1952-11-06 Production Casing Operation Performed
1952-12-15 Perforation Treatment Performed - Bullet Perforation
1953-02-01 Well Began Production
1953-02-01 Well Fluid changed to Crude Oil
1953-02-01 Well Mode changed to Pumping
1975-11-01 Well Fluid changed to Crude Oil
1975-11-01 Well Mode changed to Suspended
1976-04-21 Well Fluid changed to Crude Oil
1976-04-21 Well Mode changed to Pumping
1983-12-01 Well Fluid changed to Crude Oil
1983-12-01 Well Mode changed to Suspended
1992-03-09 Perforation Treatment Performed - Jet Perforation
1992-06-11 Well Fluid changed to Crude Oil
1992-06-11 Well Mode changed to Pumping
1993-03-09 Well Log Performed
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Flowing
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
1998-03-15 Well Log Performed
2000-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-10 Perforation Treatment Performed - Jet Perforation
2000-02-10 Plug Back Performed
2000-02-10 Well Log Performed
2000-02-24 Perforation Treatment Performed - Cement Plug
2000-02-24 Perforation Treatment Performed - Remedial Casing
2000-02-27 Well Abandoned
2000-02-27 Well Fluid changed to Crude Oil
2000-02-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-15 Bullet Perforation 977.20 977.80 20
1992-03-09 Perforation 974.50 978.00 20
2000-02-10 Packing Device Capped w/Cement 953.40 962.00 0
2000-02-10 Perforation 164.00 165.00 10
2000-02-24 Remedial Casing Cementing 164.00 165.00 0
2000-02-24 Cement Plug 120.00 165.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 216 0.0 0.0 0.0
1968 264 0.0 0.0 0.0
1969 72 0.0 0.0 0.0
1970 2232 0.0 0.0 0.0
1971 8183 0.0 0.0 0.0
1972 8092 0.0 0.0 0.0
1973 8693 0.0 0.0 0.0
1974 8055 0.0 0.0 0.0
1975 5580 0.0 0.0 0.0
1976 312 0.0 0.0 0.0
1992 4631 0.0 0.0 0.0
1993 8274 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References