X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201812000

Well Details

Well ID: 0484201812000
Loading map...
Location: 00/12-18-048-20W4/0
Location Alias: 00/12-18-48-20 W4M
Location Alias 2: 00/12-18-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 18
County/Municipality: Camrose County
Well Name: BIG VALLEY DINANT NO.12-18V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0005487
License Date: 1952-10-11
License Status: RecCertified
Spud Date: 1952-11-08
Final Drill Date: 1952-11-13
Well Total Depth: 999.70 m
Surface Hole Latitude: 53.142993
Surface Hole Longitude: -112.925513

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-11 Obtained License
1952-11-13 Drill Stem Test Performed
1952-11-13 Finished Drilling
1952-11-13 Well Mode changed to Drilled and Cased
1952-11-14 Production Casing Operation Performed
1952-12-29 Perforation Treatment Performed - Bullet Perforation
1953-03-03 Well Began Production
1953-03-03 Well Fluid changed to Crude Oil
1953-03-03 Well Mode changed to Pumping
1976-06-05 Perforation Treatment Performed - Jet Perforation
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Flowing
1997-06-17 Well Fluid changed to Crude Oil
1997-06-17 Well Mode changed to Closed
2000-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-11 Perforation Treatment Performed - Jet Perforation
2000-02-11 Plug Back Performed
2000-02-11 Well Log Performed
2000-02-25 Perforation Treatment Performed - Cement Plug
2000-02-25 Perforation Treatment Performed - Remedial Casing
2000-02-26 Well Abandoned
2000-02-26 Well Fluid changed to Crude Oil
2000-02-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-29 Bullet Perforation 977.20 977.80 20
1976-06-05 Perforation 975.40 977.20 7
1976-06-05 Perforation 977.80 982.40 7
2000-02-11 Packing Device Capped w/Cement 955.40 964.00 0
2000-02-11 Perforation 161.00 162.00 10
2000-02-25 Remedial Casing Cementing 161.00 162.00 0
2000-02-25 Cement Plug 120.00 162.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8674 0.0 0.0 0.0
1968 8707 0.0 0.0 0.0
1969 8359 0.0 0.0 0.0
1970 6752 0.0 0.0 0.0
1971 7344 0.0 0.0 0.0
1972 8274 0.0 0.0 0.0
1973 8717 0.0 0.0 0.0
1974 7811 0.0 0.0 0.0
1975 8591 0.0 0.0 0.0
1976 8064 0.0 0.0 0.0
1977 8674 0.0 0.0 0.0
1978 8004 0.0 0.0 0.0
1979 8003 0.0 0.0 0.0
1980 8246 0.0 0.0 0.0
1981 8315 0.0 0.0 0.0
1982 8315 0.0 0.0 0.0
1983 8516 0.0 0.0 0.0
1984 8188 0.0 0.0 0.0
1985 8367 0.0 0.0 0.0
1986 8120 0.0 0.0 0.0
1987 7885 0.0 0.0 0.0
1988 8579 0.0 0.0 0.0
1989 8465 0.0 0.0 0.0
1990 7907 0.0 0.0 0.0
1991 7532 0.0 0.0 0.0
1992 8353 0.0 0.0 0.0
1993 8593 0.0 0.0 0.0
1994 5899 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References