X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201902000

Well Details

Well ID: 0484201902000
Loading map...
Location: 00/02-19-048-20W4/0
Location Alias: 00/02-19-48-20 W4M
Location Alias 2: 00/02-19-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 19
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM 2-19-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0006287
License Date: 1953-04-08
License Status: RecCertified
Spud Date: 1953-04-25
Final Drill Date: 1953-05-02
Well Total Depth: 1003.70 m
Surface Hole Latitude: 53.150572
Surface Hole Longitude: -112.912952

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-08 Obtained License
1953-05-02 Finished Drilling
1953-05-02 Well Mode changed to Drilled and Cased
1953-05-03 Drill Stem Test Performed
1953-05-05 Production Casing Operation Performed
1953-05-08 Perforation Treatment Performed - Jet Perforation
1953-05-26 Well Began Production
1953-05-26 Well Fluid changed to Crude Oil
1953-05-26 Well Mode changed to Pumping
1956-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-05-19 Perforation Treatment Performed - Cement Plug
1957-05-23 Perforation Treatment Performed - Jet Perforation
1975-04-01 Well Fluid changed to Crude Oil
1975-04-01 Well Mode changed to Suspended
1977-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-28 Well Began Injection
1978-03-28 Well Fluid changed to Water
1978-03-28 Well Type changed to Injection
1983-12-01 Well Fluid changed to Water
1983-12-01 Well Mode changed to Suspended
1983-12-01 Well Type changed to Injection
1996-06-26 Well Fluid changed to Water
1996-06-26 Well Mode changed to Closed
1996-06-26 Well Type changed to Injection
1996-07-12 Well Fluid changed to Water
1996-07-12 Well Mode changed to Suspended
1996-07-12 Well Type changed to Injection
1997-06-17 Well Fluid changed to Water
1997-06-17 Well Mode changed to Closed
1997-06-17 Well Type changed to Injection
1998-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-04 Plug Back Performed
1998-09-13 Perforation Treatment Performed - Jet Perforation
1998-09-13 Well Log Performed
1998-09-15 Perforation Treatment Performed - Remedial Casing
1998-09-18 Well Abandoned
1998-09-18 Well Fluid changed to Water
1998-09-18 Well Mode changed to Abandoned
1998-09-18 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-08 Perforation 982.40 983.60 13
1956-05-19 Acid Treatment 982.40 983.60 0
1956-05-19 Cement Plug 982.40 983.60 0
1957-05-23 Perforation 981.20 982.10 13
1957-05-23 Perforation 983.60 985.10 13
1977-12-11 Acid Treatment 981.20 985.10 0
1998-09-04 Packing Device Capped w/Cement 963.00 971.00 0
1998-09-13 Perforation 175.00 176.00 13
1998-09-15 Remedial Casing Cementing 175.00 176.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 288 0.0 0.0 0.0
1968 24 0.0 0.0 0.0
1969 168 0.0 0.0 0.0
1970 288 0.0 0.0 0.0
1971 144 0.0 0.0 0.0
1972 4616 0.0 0.0 0.0
1973 8364 0.0 0.0 0.0
1974 7871 0.0 0.0 0.0
1975 1488 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References