X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201910002

Well Details

Well ID: 0484201910002
Loading map...
Location: 00/10-19-048-20W4/2
Location Alias: 00/10-19-48-20 W4M
Location Alias 2: 00/10-19-048-20 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 19
County/Municipality: Camrose County
Well Name: BIG VALLEY JOARCAM IN 10-19V-48-20
Operator Name: Big Valley Energy Corporation
License Number: 0006523
License Date: 1953-06-01
License Status: RecCertified
Spud Date: 1965-11-24
Final Drill Date: 1965-11-30
Well Total Depth: 994.00 m
Surface Hole Latitude: 53.157340
Surface Hole Longitude: -112.913702

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-01 Obtained License
1965-11-30 Finished Drilling
1965-11-30 Well Mode changed to Drilled and Cased
1965-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-01 Perforation Treatment Performed - Jet Perforation
1965-12-03 Well Began Injection
1965-12-03 Well Fluid changed to Water
1965-12-03 Well Type changed to Injection
1974-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-31 Perforation Treatment Performed - Fractured
1976-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-23 Perforation Treatment Performed - Jet Perforation
1983-12-01 Well Fluid changed to Water
1983-12-01 Well Mode changed to Suspended
1983-12-01 Well Type changed to Injection
1996-06-26 Well Fluid changed to Water
1996-06-26 Well Mode changed to Closed
1996-06-26 Well Type changed to Injection
1996-07-12 Well Fluid changed to Water
1996-07-12 Well Mode changed to Suspended
1996-07-12 Well Type changed to Injection
1997-06-17 Well Fluid changed to Water
1997-06-17 Well Mode changed to Closed
1997-06-17 Well Type changed to Injection
1998-03-16 Well Log Performed
2000-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-12 Plug Back Performed
2000-02-12 Well Fluid changed to Water
2000-02-12 Well Log Performed
2000-02-12 Well Mode changed to Abandoned Zone
2000-02-12 Well Type changed to Injection
2000-02-22 Perforation Treatment Performed - Cement Plug
2000-02-22 Perforation Treatment Performed - Remedial Casing
2000-02-25 Well Abandoned
2000-02-25 Well Fluid changed to Water
2000-02-25 Well Mode changed to Abandoned
2000-02-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-01 Perforation 976.90 978.10 7
2000-02-22 Cement Plug 120.00 165.90 0
1965-12-01 Acid Treatment 976.90 978.10 0
1974-07-29 Acid Treatment 976.90 978.40 0
1975-01-31 Fracture 976.90 978.10 0
1976-01-23 Perforation 973.20 977.20 13
1976-01-23 Acid Treatment 973.20 977.20 0
2000-02-12 Packing Device Capped w/Cement 953.30 963.00 0
2000-02-12 Perforation 164.90 165.90 10
2000-02-22 Remedial Casing Cementing 164.90 165.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References