X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212409000

Well Details

Well ID: 0484212409000
Loading map...
Location: 00/09-24-048-21W4/0
Location Alias: 00/09-24-48-21 W4M
Location Alias 2: 00/09-24-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 24
County/Municipality: Camrose County
Well Name: BRITISH AMERICAN ARMENA #9-24
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0005258
License Date: 1952-09-05
License Status: RecCertified
Spud Date: 1952-10-14
Final Drill Date: 1952-10-22
Well Total Depth: 1008.90 m
Surface Hole Latitude: 53.157777
Surface Hole Longitude: -112.931280

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-05 Obtained License
1952-10-22 Drill Stem Test Performed
1952-10-22 Finished Drilling
1952-10-22 Production Casing Operation Performed
1952-10-22 Well Mode changed to Drilled and Cased
1952-10-25 Perforation Treatment Performed - Jet Perforation
1952-10-26 Well Began Production
1952-10-26 Well Fluid changed to Crude Oil
1952-10-26 Well Mode changed to Pumping
1960-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-11 Perforation Treatment Performed - Cement Squeeze
1960-11-13 Perforation Treatment Performed - Jet Perforation
1960-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-21 Perforation Treatment Performed - Cement Squeeze
1960-11-23 Perforation Treatment Performed - Jet Perforation
1969-11-01 Well Fluid changed to Crude Oil
1969-11-01 Well Mode changed to Suspended
1971-07-13 Perforation Treatment Performed - Cement Plug
1971-07-19 Well Abandoned
1971-07-19 Well Fluid changed to Crude Oil
1971-07-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-25 Perforation 989.40 990.30 13
1960-11-11 Acid Treatment 989.40 990.30 0
1960-11-11 Cement Squeeze 989.40 990.30 0
1960-11-13 Perforation 991.20 992.10 13
1960-11-17 Acid Treatment 991.20 992.10 0
1960-11-21 Cement Squeeze 991.20 992.10 0
1960-11-23 Perforation 991.20 993.00 13
1971-07-13 Cement Plug 975.40 994.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8213 0.0 0.0 0.0
1968 8159 0.0 0.0 0.0
1969 2520 0.0 0.0 0.0

For data sources see[5]

References