X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212504000

Well Details

Well ID: 0484212504000
Loading map...
Location: 00/04-25-048-21W4/0
Location Alias: 00/04-25-48-21 W4M
Location Alias 2: 00/04-25-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 25
County/Municipality: Camrose County
Well Name: CABRE NORTH CANADIAN ARMENA 4-25
Operator Name: Enerplus Corporation
License Number: 0004361
License Date: 1952-03-03
License Status: Issued
Spud Date: 1952-03-16
Final Drill Date: 1952-03-22
Well Total Depth: 1008.90 m
Surface Hole Latitude: 53.164868
Surface Hole Longitude: -112.950022

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-03 Obtained License
1952-03-22 Finished Drilling
1952-03-22 Liner Casing Operation Performed
1952-03-22 Well Mode changed to Drilled and Cased
1952-05-08 Perforation Treatment Performed - Open-Hole Completion
1952-05-15 Well Began Production
1952-05-15 Well Fluid changed to Crude Oil
1952-05-15 Well Mode changed to Pumping
1956-05-18 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1956-05-20 Perforation Treatment Performed - Open-Hole Completion
1956-07-18 Perforation Treatment Performed - Bullet Perforation
1956-07-18 Perforation Treatment Performed - Open-Hole Completion
1958-06-12 Perforation Treatment Performed - Cement Squeeze
1958-06-12 Perforation Treatment Performed - Jet Perforation
1982-10-27 Perforation Treatment Performed - Jet Perforation
1982-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-15 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-08 Open Hole/Barefoot Completion 988.20 990.60 0
1956-05-18 Resin-Gypsum Squeeze or Plug 988.20 992.10 0
1956-05-20 Open Hole/Barefoot Completion 992.10 992.40 0
1956-07-18 Open Hole/Barefoot Completion 992.10 992.70 0
1956-07-18 Bullet Perforation 991.80 992.40 16
1958-06-12 Cement Squeeze 988.20 992.70 13
1958-06-12 Perforation 993.00 994.30 13
1982-10-27 Perforation 989.40 993.00 13
1982-10-28 Acid Treatment 989.40 993.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8574 0.0 0.0 0.0
1968 8643 0.0 0.0 0.0
1969 7779 0.0 0.0 0.0
1970 8351 0.0 0.0 0.0
1971 8519 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8556 0.0 0.0 0.0
1974 8639 0.0 0.0 0.0
1975 8464 0.0 0.0 0.0
1976 8603 0.0 0.0 0.0
1977 8599 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 8435 0.0 0.0 0.0
1980 8440 0.0 0.0 0.0
1981 8667 0.0 0.0 0.0
1982 7989 0.0 0.0 0.0
1983 8165 0.0 0.0 0.0
1984 8189 0.0 0.0 0.0
1985 8161 0.0 0.0 0.0
1986 8107 0.0 0.0 0.0
1987 7962 0.0 0.0 0.0
1988 8471 0.0 0.0 0.0
1989 8423 0.0 0.0 0.0
1990 8364 0.0 0.0 0.0
1991 8641 0.0 0.0 0.0
1992 8528 0.0 0.0 0.0
1993 6450 0.0 0.0 0.0
1994 7680 0.0 0.0 0.0
1995 5275 0.0 0.0 0.0

For data sources see[5]

References