If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485080704022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.145219,"lon":-115.168636,"icon":""}]} |
Location: 02/04-07-048-08W5/2 | |
Location Alias: 02/04-07-48-08 W5M | |
Location Alias 2: 02/04-07-048-08 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 07 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ 102 PEMBINA 4-7-48-8 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0444862 | |
License Date: 2012-03-09 | |
License Status: Amended | |
Spud Date: 2012-07-08 | |
Final Drill Date: 2012-07-24 | |
Well Total Depth: 4150.00 m | |
Surface Hole Latitude: 53.145219 | |
Surface Hole Longitude: -115.168636 |
Date | Event |
---|---|
2012-03-09 | Obtained License |
2012-07-09 | Surface Casing Operation Performed |
2012-07-10 | Direction Drilling Operation Performed - Deviate |
2012-07-14 | Well Log Performed |
2012-07-15 | Direction Drilling Operation Performed - Horizontal |
2012-07-15 | Intermediate Casing Operation Performed |
2012-07-24 | Finished Drilling |
2012-07-24 | Well Log Performed |
2012-07-24 | Well Mode changed to Drilled and Cased |
2012-07-26 | Liner Casing Operation Performed |
2012-07-26 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-27 | Rig Released |
2012-08-10 | Well Log Performed |
2012-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-12 | Well Began Production |
2012-08-12 | Well Fluid changed to Crude Oil |
2012-08-12 | Well Mode changed to Pumping |
2015-10-01 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-10 | 1347.00 | Deviate (5 - 79 degrees) |
2012-07-15 | 1783.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-26 | Open Hole/Barefoot Completion | 4137.00 | 4150.00 | 0 |
2012-08-11 | Multi-Stage Fracture | 2727.50 | 2727.60 | 0 |
2012-08-11 | Multi-Stage Fracture | 2831.60 | 2831.70 | 0 |
2012-08-11 | Multi-Stage Fracture | 2923.90 | 2924.00 | 0 |
2012-08-11 | Multi-Stage Fracture | 3016.30 | 3016.40 | 0 |
2012-08-11 | Multi-Stage Fracture | 3108.20 | 3108.30 | 0 |
2012-08-11 | Multi-Stage Fracture | 3200.50 | 3200.60 | 0 |
2012-08-11 | Multi-Stage Fracture | 3293.00 | 3293.10 | 0 |
2012-08-11 | Multi-Stage Fracture | 3385.60 | 3385.70 | 0 |
2012-08-11 | Multi-Stage Fracture | 3478.50 | 3478.60 | 0 |
2012-08-11 | Multi-Stage Fracture | 3570.80 | 3570.90 | 0 |
2012-08-11 | Multi-Stage Fracture | 1892.40 | 1892.50 | 0 |
2012-08-11 | Multi-Stage Fracture | 3663.20 | 3663.30 | 0 |
2012-08-11 | Multi-Stage Fracture | 3755.90 | 3756.00 | 0 |
2012-08-11 | Multi-Stage Fracture | 3849.00 | 3849.10 | 0 |
2012-08-11 | Multi-Stage Fracture | 3942.20 | 3942.30 | 0 |
2012-08-11 | Multi-Stage Fracture | 4035.50 | 4035.60 | 0 |
2012-08-11 | Multi-Stage Fracture | 4132.40 | 4132.50 | 0 |
2015-10-01 | Chemical Squeeze | 1892.40 | 2518.90 | 0 |
2012-08-11 | Multi-Stage Fracture | 1996.70 | 1996.80 | 0 |
2012-08-11 | Multi-Stage Fracture | 2101.70 | 2101.80 | 0 |
2012-08-11 | Multi-Stage Fracture | 2205.90 | 2206.00 | 0 |
2012-08-11 | Multi-Stage Fracture | 2309.40 | 2309.50 | 0 |
2012-08-11 | Multi-Stage Fracture | 2414.60 | 2414.70 | 0 |
2012-08-11 | Multi-Stage Fracture | 2518.80 | 2518.90 | 0 |
2012-08-11 | Multi-Stage Fracture | 2622.50 | 2622.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2659 | 0.0 | 0.0 | 0.0 |
2013 | 8109 | 0.0 | 0.0 | 0.0 |
2014 | 6774 | 0.0 | 0.0 | 0.0 |
2015 | 8535 | 0.0 | 0.0 | 0.0 |
2016 | 8255 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 7696 | 0.0 | 0.0 | 0.0 |
2019 | 8684 | 0.0 | 0.0 | 0.0 |
2020 | 2155 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-27 | No Incident Encountered | 0.00 | 0.00 |
2012-08-22 | No Incident Encountered | 0.00 | 0.00 |
2015-10-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]