X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485083016000

Well Details

Well ID: 0485083016000
Loading map...
Location: 00/16-30-048-08W5/0
Location Alias: 00/16-30-48-08 W5M
Location Alias 2: 00/16-30-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 30
County/Municipality: Brazeau County
Well Name: TQN PEMBINA 16-30-48-8
Operator Name: TAQA North Ltd.
License Number: 0290511
License Date: 2003-07-28
License Status: Suspension
Spud Date: 2003-09-03
Final Drill Date: 2003-09-11
Well Total Depth: 2105.00 m
Surface Hole Latitude: 53.174842
Surface Hole Longitude: -115.152394

For data sources see[1][2]

Well History

Date Event
2003-07-28 Obtained License
2003-09-05 Surface Casing Operation Performed
2003-09-11 Finished Drilling
2003-09-11 Well Log Performed
2003-09-11 Well Mode changed to Drilled and Cased
2003-09-13 Production Casing Operation Performed
2003-09-13 Rig Released
2003-11-18 Perforation Treatment Performed - Jet Perforation
2003-11-29 Perforation Treatment Performed - Fractured
2003-12-15 Perforation Treatment Performed - Jet Perforation
2003-12-15 Well Log Performed
2003-12-18 Well Log Performed
2003-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-19 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-12-19 Plug Back Performed
2003-12-19 Well Mode changed to Abandoned Zone
2003-12-20 Perforation Treatment Performed - Jet Perforation
2003-12-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-18 Perforation 2070.00 2071.00 17
2003-12-22 Fracture 1914.50 1917.00 0
2003-11-29 Fracture 2070.00 2071.00 0
2003-12-15 Perforation 2082.20 2083.20 17
2003-12-15 Perforation 2080.00 2081.00 17
2003-12-15 Perforation 2076.00 2077.00 17
2003-12-19 Bridge Plug, No Cement 2075.00 2075.50 0
2003-12-19 Packing Device Capped w/Cement 2060.00 2068.00 0
2003-12-20 Perforation 1914.50 1917.00 13
2003-12-22 Fracture 1914.50 1917.00 0

For data sources see[4]



References